cosors
👀
They seem a bit insecure because they have to wear helmets instead of masks
I have tried to translate the video very roughly, it is worth a close look!And so it will go on now. I think Talga will quickly become better known. The absolute test will be passed when I read the first article about Talga by the thick-headed Germans. So far they ignore Talga because they propagate their SGL and SG. Of course, the OEMs don't care about that.
I think in a week or two this will have made the rounds and our name will also be where it was not before. As this is now the official start of the first European anode factory.
And yes, the graphite car has to be in the picture, otherwise it wouldn't be about Talga
"Europe's first anode factory for batteries was inaugurated in Luleå
1.4.2022, 19:16:47
Now Talga has inaugurated a pilot factory in Luleå. There, anodes of graphite will be manufactured, which is an important component in electric car batteries. Despite the fact that the company does not have a permit for a graphite mine in Vittangi and a full-scale factory on Hertsön, you can not wait. - Then we do not have time because then the train has already left the platform, says Per-Erik Lindvall, chairman of the board of Talga. Clear words and clearly addressed. I find that exceptionally good!
Already now the interest from both customers and partners is great.
More than 20 battery and vehicle customers are queuing up to receive their first deliveries of materials for large-scale and commercial testing.
Some tests are done at the pilot plant, where some rooms are super secret and covered with a photo ban.
The graphite to be processed comes from test mines in Vittangi.
Europe is predicted to need 800,000 tonnes
On the podium where the inauguration ceremony was held is a black heavy car made entirely of graphite.
Of course, this is not a large part in reality, but an electric car's battery consists of 40-50 percent graphite.
The conversion to electric vehicle fleet for climate reasons is the driving force and what has made the demand for graphite nodes increased enormously.
Forecasts say that Europe will need 800,000 tonnes of graphite in five years.
The graphite in Vittangi is unique in the world
Graphite can be produced synthetically, from petroleum coke or coal tar.
That production consumes a lot of energy and produces dangerous emissions.
The natural graphite is cleaner.
And the deposit in Vittangi is called world unique by the Talga Group.
- Others are happy if they have five percent graphite, in Vittangi 30 percent, says Per-Erik Lindvall, chairman of the board of Talga.
No permits ready
Neither the graphite mine in Vittangi nor the factory on Hertsön in Luleå are licensed.
Still, the actors talk as if everything is ready. Haha - I wonder where the confidence comes from! LoL
- The large-scale facility planned for 2024 will be located on the Hertsö field in Luleå.
It will be able to deliver 19,500 tonnes of finished anode material per year.
That is enough for 400,000 electric cars every year, says Talga's European director Martin Phillips.
In the video, the chairman of the board of Talga explains why they open a pilot factory without having the permits ready.
Unfortunately I still cannot understand Swedish => https://www.svt.se/nyheter/lokalt/norrbotten/talga-invigde-europas-forsta-anodfabrik-for-batterier-i-lulea
Keywords:
Source: svt" https://www.tellerreport.com/news/2022-04-01-europe-s-first-anode-factory-for-batteries-was-inaugurated-in-lule%C3%A5.SJZdFX3VQ5.html
or https://kuriren.nu/bli-prenumerant/artikel/l6n93mzr or https://batteriesnews.com/talga-europe-first-li-ion-battery-anode-plant-commissioned-operating/
Don't worry, I won't post every snippet and new article here. This is going to make the rounds now, I think
Enjoy the weekend!
Why so soon? The chairman of the board just said to that they expect permits in the summer or early autumn. That's .. 2 to 4 months away. And not next week. Funding and offtake might come at any time though.I guess we wait for 3 announcements to follow...
Permits
Funding
Offtakes
Me thinks (and strongly believes these three things are done) they will all come at the same time and in the very (like next week) future.
Optimistic nah just honest all the best peeps we waited along time for this. Well done talga
Let's hope that you are not optimistic and projecting the necessary ; )I guess we wait for 3 announcements to follow...
Permits
Funding
Offtakes
Me thinks (and strongly believes these three things are done) they will all come at the same time and in the very (like next week) future.
Optimistic nah just honest all the best peeps we waited along time for this. Well done talga
After all that sand, I love reading such sweet words.Why so soon? The chairman of the board just said to that they expect permits in the summer or early autumn. That's .. 2 to 4 months away. And not next week. Funding and offtake might come at any time though.
Well that certainly set the pulses racing - a politician who gets it.Let's hope that you are not optimistic and projecting the necessary.
I may understand why the Foreign Ministry was represented there. The calls from Brussels get there first and who was MT on a call with?!
I think the insight is good for understanding and the signals of support are absolutely clear (s.b.).
"State Secretary Krister Nilsson from the Ministry for Foreign Affairs was one of the inaugural speakers at the event today.
- We who work with trade issues on the part of the government see that this is important for international trade, our role in Europe and in the world, he says."
Please bear with me for my mistakes, this is quite difficult for me and without the help of DeepL it would be impossible. I highly recommend it, google sometimes only comes up with nonsense. In this video he says roughly translated: https://www.svt.se/nyheter/lokalt/n...pa-till-for-utvecklingen-ska-ga-at-detta-hall
"We have learned here today that it is a unique quality of deposit that is being worked by Talga. And that also means that we have the possibility to produce batteries that can withstand the cold better with more power and less energy consumption at that time. And then we exploit that.
We are here because we want to be part of this development and we are doing everything we can to support it, quite simply."
how beautiful this reads: "helt enkelt." => ", quite simply."
Hi CorosorLet's hope that you are not optimistic and projecting the necessary ; )
I may understand why the Foreign Ministry was represented there. The calls from Brussels get there first and who was MT on a call with?!
I think the insight is good for understanding and the signals of support are absolutely clear (s.b.).
"State Secretary Krister Nilsson from the Ministry for Foreign Affairs was one of the inaugural speakers at the event today.
- We who work with trade issues on the part of the government see that this is important for international trade, our role in Europe and in the world, he says."
Please bear with me for my mistakes, this is quite difficult for me and without the help of DeepL it would be impossible. I highly recommend it, google sometimes only comes up with nonsense. In this video he says roughly translated: https://www.svt.se/nyheter/lokalt/n...pa-till-for-utvecklingen-ska-ga-at-detta-hall
"We have learned here today that it is a unique quality of deposit that is being worked by Talga. And that also means that we have the possibility to produce batteries that can withstand the cold better with more power and less energy consumption at that time. And then we exploit that.
We are here because we want to be part of this development and we are doing everything we can to support it, quite simply."
how beautiful this reads: "helt enkelt." => ", quite simply."
Hi Gero!Hi Corosor
Thank you so much for your efforts in translating the videos into English text, it is greatly appreciated.
I hope you don't mind me using your translations in my posts at the other place?
Have a great weekend!
Gero