The official line from CAMI is that they are still calculating the surface rights. While that is nonsensical Mupande can say and do whatever he wants. If AVZ had of given him some snacks it would have been completed in days. The fact that he has been fired by 2 different presidents and a replacement has been named yet he is still in control speaks volumes. Nothing is going to happen until he is replaced or decides to register the mining licence to try and take the heat from the IGF off him.
View attachment 24334
View attachment 24335
This has to be done by the book. I understand Tshisekedi not intervening directly yet. He is promoting that the rule of law must be followed which means that the correct processes with the independent investigators and organisations need to be completed. The good news is all of the facts are on our side and that is recognised in the IGF report.
From the AGM Question and Answer Session:
What happened after ML Decree, spurious yet we’re in suspension. What’s the main issue for ML – is it Dathomir, is Zijin ICC arbitration 15, dispute with exploration rights?
A: Lot of players in vogue here in country, lot of hatchet jobs being done – President had a bad view from being ill advised by detractors (e.g. we hadn’t done anything, didn’t have money experience, and were speculators). Detractors continuing, but slowly slowly we’re working to remove the blocks.
We knew Chinese would have a crack, but we did not expect parts of DRC government to be in on it?
A: Nor did we - “we thought it was gambit by Chinese groups to get project cheapest way. We weren’t aware it was also elements of the government complicit. We can’t go into it, but rest assured those people are being turned over within meetings with real information is being shared, and people put on the spot.
Collusion between all those 3 – namely Zijin, Jin Cheng, CAMI?
A: That would be astute thought
Issue that a portion of mines directorate said we hadn’t done the work on the northern tenement area, and shouldn’t get the north?
A: That’s not within the mining code. So 13359 should be retained in its entirety – however the northern area may need to come under a separate exploration tenement, even though that’s not the established process. – We know who’s behind this (e.g. DG CAMI)