Posted by acwbagnall on HC:
I received a response from the SC last night :

"The case is yet to be referred to a Justice and at this time the Supreme Court cannot indicate when a decision will be made.
No hearing is scheduled in this case"
 
  • Like
Reactions: 3 users

cosors

👀
Posted by acwbagnall on HC:
Haven't we already known this from Vigdorian since 6 September? The case has been transferred. Then later came the info that collective illness was the reason.
Please correct me if I'm wrong.
 
  • Like
Reactions: 4 users

Semmel

Regular
Haven't we already known this from Vigdorian since 6 September? The case has been transferred. Then later came the info that collective illness was the reason.
Please correct me if I'm wrong.
As the info came yesterday, it means there was no progress since
 
  • Like
  • Wow
Reactions: 3 users

JNRB

Regular
As the info came yesterday, it means there was no progress since
unbelieveable
 
  • Like
  • Wow
  • Love
Reactions: 3 users

JoMo68

Regular
F**king unf**king believable
 
  • Haha
  • Like
Reactions: 6 users

cosors

👀
"Done: Talga gets permission for mining
Talga has received the nod from Kiruna municipality to make the graphite mine in Kiruna a reality. On Thursday, however, a decision was brought with it - namely the exclusive right to mining in the area.

2024-10-17 12:58

The notice thus gives Talga the exclusive right to mine the graphite deposit called Nunasvaara Södra K no. 1 outside Vittangi. The company has previously applied for an environmental permit and received the go-ahead from the Land and Environment Court on April 5, 2023. The decision was appealed all the way to the Supreme Court and the permit has not yet gained legal force. Kiruna municipality does not want to give either..." rbPW

 
Last edited:
  • Like
  • Love
Reactions: 9 users

cosors

👀
The last pending permit!

"Talga gets green light for yet another mining deposit​

LULEÅ. The Mining Inspectorate grants the mining company Talga a mining concession for another graphite deposit in Vittangi.
At the same time, Vilhelmina Minerals' plans for a restart of the Stekenjokk mine in the VĂ€sterbotten mountains will be rejected.
Published: 17 October 2024, 16:06

On Wednesday, the Mining Inspectorate announced decisions in three cases concerning mining concessions for mining deposits.

A mining concession gives a mining company the right to the deposit, but not to start mining. An environmental permit is also required for this.

The Australian mining company Talga has since last year an environmental permit to mine graphite in Vittangi in Kiruna municipality. The decision has been appealed and therefore the start of production for the mine is delayed. The company is also building a factory in LuleÄ that will take care of the graphite that is mined in Vittangi.

Now the Mining Inspectorate has granted Talga a mining concession for another (?) graphite deposit in the same area. Graphite is an important raw material in electric car batteries.

"This is a high-quality graphite deposit and the applicant's tests have shown that it can be processed into materials for the production of lithium-ion batteries. The area is considered to contain a large mineral resource. The concession means good management of resources by enabling the extraction of a deposit of national interest," says Chief Mining Officer Helena Kjellson in a statement.

At the same time, Vilhemina Mineral is turned down to restart the copper mine in Stekenjokk, which was run by Boliden during the 1970s and 1980s. The mining master writes that the company has not been able to show that a mine in Stekenjokk is profitable.

However, the company is granted a mining concession for another deposit in the area, Levi, where there is copper, silver, zinc and lead."


One important hurdle less.
I remind that we had submitted the application for the processing concession (one of the three permits) and the environmental permit at the same time. Then it was on hold for a while because of the then still outstanding Natura2000, which was granted later. Then, in my memory, the board commented that everything depends on the SC's decision. It seems to me that this is not the case and that Talga has now been granted this concession in parallel, see in bold in the next post. The process has been changed and the Natura2000 is now independent from, in our case, the SC decision.

That's the concession!!
bearbetningskoncession => Bergsstaten

Talga now has all the necessary permits and just has to wait for the plan and the SC decision. Then the head of Bergsstaten can ram the spade into the ground for the opening ceremony!
 
Last edited:
  • Love
  • Like
Reactions: 11 users

cosors

👀
Thanks Gvan and Semmel!


Translation:
Yes to graphite mine outside Vittangi
Updated today 12:36Published today 12:03
The mountain state now says yes to the grant Talga AB processing concession for the graphite discovery Nunasvaara outside Vittangi in Kiruna municipality.
"The congregation has national interest," said BergmÀstare Helena Kjellson.
The area is part of Talga AB’s major graphite project, which includes four deposits. The current deposit is in an area that is designated as national interest for valuable substances or materials.
'Great mineral access'
“This is a high-quality graphite discovery and the applicant’s tests have shown that it can be processed into materials for the production of lithium-ion batteries. The area is judged to contain a large mineral resource, says Helena Kjellson.

There has been a lot of opposition to the plans for a graphite mine, including from residents in the area.
An amendment to the Minerals Act, which took effect on 1 July 2024, has enabled the mountain master to grant a processing concession even though the issue of Natura 2000 permit is not finally settled.
'Good housekeeping'
“The concession means good management of resources by enabling the extraction of a deposit of national interest,” says BergmĂ€stare Helena Kjellson.
Talga AB submitted its application to the Mountain State in 2020.
“A further authority now confirms the validity and importance of this project, incidentally at a time where the need for its own supply of graphite in the EU is becoming increasingly tangible,” said Martin Phillips, CEO of Talgas.
 
  • Like
  • Fire
Reactions: 7 users

cosors

👀
Thanks Gvan and Semmel!


Translation:
Yes to graphite mine outside Vittangi
Updated today 12:36Published today 12:03
The mountain state now says yes to the grant Talga AB processing concession for the graphite discovery Nunasvaara outside Vittangi in Kiruna municipality.
"The congregation has national interest," said BergmÀstare Helena Kjellson.
The area is part of Talga AB’s major graphite project, which includes four deposits. The current deposit is in an area that is designated as national interest for valuable substances or materials.
'Great mineral access'
“This is a high-quality graphite discovery and the applicant’s tests have shown that it can be processed into materials for the production of lithium-ion batteries. The area is judged to contain a large mineral resource, says Helena Kjellson.

There has been a lot of opposition to the plans for a graphite mine, including from residents in the area.
An amendment to the Minerals Act, which took effect on 1 July 2024, has enabled the mountain master to grant a processing concession even though the issue of Natura 2000 permit is not finally settled.
'Good housekeeping'
“The concession means good management of resources by enabling the extraction of a deposit of national interest,” says BergmĂ€stare Helena Kjellson.
Talga AB submitted its application to the Mountain State in 2020.
“A further authority now confirms the validity and importance of this project, incidentally at a time where the need for its own supply of graphite in the EU is becoming increasingly tangible,” said Martin Phillips, CEO of Talgas.
Here a bad joke:

"If this is the case, the next step is to apply for a processing concession. You must then prove to the miner that the deposit exists and can be mined profitably.

The application must also be accompanied by an environmental impact statement. The extraction must not be unreasonable in terms of nature conservation or reindeer husbandry, for example.

If you have got this far, it is time to apply for an environmental licence from the Land and Environment Court. If you are granted a licence, it will be subject to conditions as to how much noise, dust and other environmental impact it may cause.

Source: SGU"

They should update this as a matter of urgency.
If Talga had followed their advice and not submitted it at the same time, we could expect a valid environmental permit from 2028 on. Really bad advice or a bad joke.
 
  • Like
  • Thinking
Reactions: 4 users

JNRB

Regular
I know we're all assuming that EU / Sweden will get their shit together and futures permit applications will actually be processed to the point of enactment within a reasonable time....

But is the company actually relying on that?

And if not, then based on our current experience (ie that even just deciding whether an appeal is reasonable can take an entire fucking year), what is the prudent timeline to start applying for permits for expansion? And where is the company in that process / how does it fit in current timelines?

Don't expect anyone here has the answers, but just something I've started thinking about and might email the company on.

If we're potentially still looking at timelines that are 4-5 years, then even scaled-up production for 2030 means we need to start getting moving on that shit now-ish. Not so much of a problem if EU/Sweden does get their shit together, but I for one have lost a lot of faith in both those institutions.
 
  • Like
  • Love
  • Thinking
Reactions: 7 users
I know we're all assuming that EU / Sweden will get their shit together and futures permit applications will actually be processed to the point of enactment within a reasonable time....

But is the company actually relying on that?

And if not, then based on our current experience (ie that even just deciding whether an appeal is reasonable can take an entire fucking year), what is the prudent timeline to start applying for permits for expansion? And where is the company in that process / how does it fit in current timelines?

Don't expect anyone here has the answers, but just something I've started thinking about and might email the company on.

If we're potentially still looking at timelines that are 4-5 years, then even scaled-up production for 2030 means we need to start getting moving on that shit now-ish. Not so much of a problem if EU/Sweden does get their shit together, but I for one have lost a lot of faith in both those institutions.
I submitted the following question for the last webinar: ‘What other permits have already been initiated/obtained to initiate the expansion of production? Is it still realistic to reach production by 2030?’

Mark touched on this on the 51 minute mark:


Alex put the question to Mark in the webinar as follows:
Speaking of um expansions what other permits have been initiated or obtained to initiate the expansion of production?

Mark's answer:
We've got an exploitation permit application in for Niska that's outstanding that's been in for a while now. The mines department ... the rules changed but previously you used to get a mining lease first then you put in your environmental later then it got changed - you had to put environmental in first before you get mining which is what we're in now and now it's changed back again. So uh we've had that exploitation permit in for Niska we've got various permits underway everything from power lines to various roads and other infrastructure logistical things you need around it. Again down at the refinery you've got things like transport of chemicals things like that a whole bunch of different permits have been gained already for different parts of the business at different parts of the time. But that's what's existing currently on the on the mining scenario up there.

In fact, I would also have liked to know what further permits are needed that are still being examined by the authorities or, if necessary, have not yet been applied for - but I obviously omitted to ask for them explicitly.

I would assume that Nunasvaara South (in November/December) and Niska (at the same time or in the following round) will be defined as strategic projects and will benefit from preferential treatment, which will hopefully significantly shorten the permit process. However, based on the experience of recent years, I am sure that there will still be unexpected delays and hiccups in the future. The bureaucratic requirements are becoming more complex and extensive from year to year, and even if states double the size of their bureaucracies and partially automate processes using AI, it will be difficult to keep pace.

Mark had mentioned that so far there have only been considerations and studies that an underground mine COULD be established and thus accelerate the extraction of graphite and reduce the impact on the (above-ground) environment - that sounded like purely theoretical considerations, so I can't imagine that (all) the necessary permits have already been applied for.

The following target was defined in the objectives for the CRMA:
For Strategic Projects in the EU, the duration of the permit granting process should not exceed 27 months projects involving extraction and should not exceed 15 months for Strategic Projects involving only processing or recycling.

Let us assume that it takes 12-18 months for the EU directive to be transposed into national law and for Talga to submit all the necessary permits for an underground mine, and the officials then utilise the full 27 months, then we will already be in spring 2028. After that, we can only start building the mine (I don't have a clue how long this may take), and at the same time we also have to build new anode factories or expand the existing ones, finalise the financing, etc. - so we're already heading towards 2030. And then there are the occasional political or economic hotspots on a global scale that can become a stumbling block. So I am prepared that we need to have a lot of stamina! But of course there is also a bull case with much faster progress, that looks much more pleasing. Mark regularly tends to outline the more optimistic scenarios in the webinars, so no need to mention those aspects in detail I guess. ;)
 
  • Like
  • Love
  • Sad
Reactions: 10 users

mpk1980

Member
I submitted the following question for the last webinar: ‘What other permits have already been initiated/obtained to initiate the expansion of production? Is it still realistic to reach production by 2030?’

Mark touched on this on the 51 minute mark:


Alex put the question to Mark in the webinar as follows:


Mark's answer:


In fact, I would also have liked to know what further permits are needed that are still being examined by the authorities or, if necessary, have not yet been applied for - but I obviously omitted to ask for them explicitly.

I would assume that Nunasvaara South (in November/December) and Niska (at the same time or in the following round) will be defined as strategic projects and will benefit from preferential treatment, which will hopefully significantly shorten the permit process. However, based on the experience of recent years, I am sure that there will still be unexpected delays and hiccups in the future. The bureaucratic requirements are becoming more complex and extensive from year to year, and even if states double the size of their bureaucracies and partially automate processes using AI, it will be difficult to keep pace.

Mark had mentioned that so far there have only been considerations and studies that an underground mine COULD be established and thus accelerate the extraction of graphite and reduce the impact on the (above-ground) environment - that sounded like purely theoretical considerations, so I can't imagine that (all) the necessary permits have already been applied for.

The following target was defined in the objectives for the CRMA:


Let us assume that it takes 12-18 months for the EU directive to be transposed into national law and for Talga to submit all the necessary permits for an underground mine, and the officials then utilise the full 27 months, then we will already be in spring 2028. After that, we can only start building the mine (I don't have a clue how long this may take), and at the same time we also have to build new anode factories or expand the existing ones, finalise the financing, etc. - so we're already heading towards 2030. And then there are the occasional political or economic hotspots on a global scale that can become a stumbling block. So I am prepared that we need to have a lot of stamina! But of course there is also a bull case with much faster progress, that looks much more pleasing. Mark regularly tends to outline the more optimistic scenarios in the webinars, so no need to mention those aspects in detail I guess. ;)


@teilenswert This has been something i have been concerned about and pondering too.

TLG made the following announcement on 01/09/21 in regards to submitting exploitation concessions for rest of the deposits. You'd have to think these submissions would be to drill underground given it was talked about and considered prior to this.

1729387730580.png



Like you say alot of things are still in motion and unknow (i.e.. CRMA and pro-mining law changes by the govt) so once the environmental permit appeal is settled i am hopeful management is able better explain how they plan to proceed. I'm hoping the CRMA and Swedish's acceleration office together will help expedite the permitting process. TLG is probably somewhat hamstrung in what they could say with what's going on?
 
  • Like
Reactions: 1 users