TLG Discussion 2022

Semmel

Top 20
Trail mine is long over and I believe the land has been restored to prove it's possible to restore the land. I'm not certain on the trail mine volume but my head remembers 27kt of ore, enough for 6t Talnode-C
 
  • Like
Reactions: 1 users
Hi All, Can someone confirm if we are still producing from the ‘trial’ mine over this summer? And if so what volume? And finally how much stock pile do we have?
Thx 🙏

Trial mine is closed and being rehabilitated with the re-moss project. Nothing more coming out of the ground until 2027.

The stockpile should be enough for 5000-6000t of anode material.
 
  • Like
Reactions: 1 users

ACinEur

Regular
Thank you both…Need to get my head back into the game on TLG. 🙏
 
Top Bottom