Semmel

Top 20
Courtesy to GVan:


* Shows ore from the mine
* Mark: "Probably within 12 month you can start construction. It would take about 2 years to finish building [...] So within 1 to 3 years until you are producing material in scale, with 3 years before you are fully developed." --- I understand that as start of production at low volume in 2028, and full volume in 2031.
* "Ultimately, who are your customers?" .. Mark: "Battery manufacturers." (*dhuuu*)
* Mark (paraphrasing): Chinese export restrictions will drive customers to us, in combination with green laws and support from EU regulations such as the battery passport.

Must say.. the timeline is a bit disappointing.. I was hoping it would be faster. Thx Sweden for making this as hard and long as possible I guess.. I bet China (with all its flaws) will take less than 3 years where we need 10 to 12. Europe doesn't stand a chance in the battery business if CRMA doesn't have the desired impact. This includes the Sami.
 
  • Like
Reactions: 8 users

cosors

👀
Courtesy to GVan:


* Shows ore from the mine
* Mark: "Probably within 12 month you can start construction. It would take about 2 years to finish building [...] So within 1 to 3 years until you are producing material in scale, with 3 years before you are fully developed." --- I understand that as start of production at low volume in 2028, and full volume in 2031.
* "Ultimately, who are your customers?" .. Mark: "Battery manufacturers." (*dhuuu*)
* Mark (paraphrasing): Chinese export restrictions will drive customers to us, in combination with green laws and support from EU regulations such as the battery passport.

Must say.. the timeline is a bit disappointing.. I was hoping it would be faster. Thx Sweden for making this as hard and long as possible I guess.. I bet China (with all its flaws) will take less than 3 years where we need 10 to 12. Europe doesn't stand a chance in the battery business if CRMA doesn't have the desired impact. This includes the Sami.
China has withdrawn its ambitions with the insolvency of NV. Job done.
Sweden has also built up a bulwark against the Chinese anode plant.
If I trust the statements of employees, I can assume that China sabotaged NV with their machines and the poor installation (NV's quality problems...).
In the general thread I posted another possibility with Bosh or Mercedes.

_____
"Probably within 12 month you can start construction. It would take about 2 years to finish building ..."

There will be a ramp-up. And one of the three identical production lines in the new facility is already in operation at Swerim.
He has become very careful. Only understandable.
 
Last edited:
  • Like
Reactions: 8 users

mpk1980

Member
China has withdrawn its ambitions with the insolvency of NV. Job done.
Sweden has also built up a bulwark against the Chinese anode plant.
If I trust the statements of employees, I can assume that China sabotaged NV with their machines and the poor installation (NV's quality problems...).
In the general thread I posted another possibility with Bosh or Mercedes.

_____
"Probably within 12 month you can start construction. It would take about 2 years to finish building ..."

There will be a ramp-up. And one of the three identical production lines in the new facility is already in operation at Swerim.
He has become very careful. Only understandable.
So what will the EVA plant be used for? Continued piloting or could it produce anode for 3C markets?
 
  • Like
  • Thinking
Reactions: 5 users
So what will the EVA plant be used for? Continued piloting or could it produce anode for 3C markets?
If the EVA plant could be used to produce anode material for any markets at a profit, then Mark would certainly have dropped this possibility in one of the webinars. I can't remember any statement in this direction.
 
  • Like
Reactions: 7 users
Finally some honesty about the ramp-up period. I've been saying this for 12 months that the timelines didn't add up.
Until now every message has been 18-24 months construction and implied full nameplate production immediately. It never made any sense.

Anyone want to venture a guess as to why the anode refinery wasn't included in the CRM strategic project application?
 

cosors

👀
So what will the EVA plant be used for? Continued piloting or could it produce anode for 3C markets?
That's a good question. But Talga is right not to let us look at the cards. Don't forget, China is always breathing down our necks and is a constant threat. I can imagine that it will remain in place for the transition, but will then be relocated. So one less plant to finance. I seem to remember seeing three of these plants in an outline/map (?) of the factory and I think it stood somewhere that they will be identical to the one in the EVA.
Of course, the hope is that three will be built and because the demand will be so high, they will put the fourth one next to it.)
I suspect, that it could be used to produce what is envisaged as series production, as it is identical in construction.
 
  • Like
  • Fire
Reactions: 4 users

Semmel

Top 20
I know you guys believe that since forever but I keep claiming that the EVA is not capable of producing industrial scale volumes. It proves the process as it is analogous and it produces volumes for testing and verification. But it does not provide the volume to the tune of 1/3rd of the factory. I cannot remember Talga claiming that ever. I think you invented this.
 

cosors

👀
I know you guys believe that since forever but I keep claiming that the EVA is not capable of producing industrial scale volumes. It proves the process as it is analogous and it produces volumes for testing and verification. But it does not provide the volume to the tune of 1/3rd of the factory. I cannot remember Talga claiming that ever. I think you invented this.
It is written somewhere. Either in one of the EVA announcements or in the plan for the factory.
I'm not making this up. A search here in the forum has so far been in vain.
I'm thinking about whether I should look for it or leave it at that. Over the years, we know how difficult it is to get practical details.
We have only learnt about many things through public documents from the municipality. It's also possible that it was there somewhere.
I'll see if I feel like looking for it.
Actually, it's the same as always - wait and see what happens. I've become a pro at waiting 😅
 
  • Love
  • Like
Reactions: 3 users

cosors

👀
It is written somewhere. Either in one of the EVA announcements or in the plan for the factory.
I'm not making this up. A search here in the forum has so far been in vain.
I'm thinking about whether I should look for it or leave it at that. Over the years, we know how difficult it is to get practical details.
We have only learnt about many things through public documents from the municipality. It's also possible that it was there somewhere.
I'll see if I feel like looking for it.
Actually, it's the same as always - wait and see what happens. I've become a pro at waiting 😅
With headings like this, it's a little easier to wait.

"Over 400 gigafactories in 2030 pipeline, but overcapacity fears loom​

There are now 401 gigafactories planned to be in operation by 2030, representing almost nine terawatt hours of annual production capacity, according to Benchmark. The 400th gigafactory to be added to the pipeline is Tata Group’s £4 billion ($5.2 billion), 40 gigawatt-hour UK-based facility due to begin production in 2026. While the pipeline highlights the […]" rbPW
 
  • Wow
  • Fire
Reactions: 3 users

cosors

👀
It is written somewhere. Either in one of the EVA announcements or in the plan for the factory.
I'm not making this up. A search here in the forum has so far been in vain.
I'm thinking about whether I should look for it or leave it at that. Over the years, we know how difficult it is to get practical details.
We have only learnt about many things through public documents from the municipality. It's also possible that it was there somewhere.
I'll see if I feel like looking for it.
Actually, it's the same as always - wait and see what happens. I've become a pro at waiting 😅
I seem to have got the info from an interview article. I used to have a subscription to the local newspapers and have reproduced the content for you so that there are no copyright problems. I have found this reference so far:

Jul 18, 2022
"Just a little info from the articles, so again just in my words and without warranty.

The EVA oven was/is made in Germany. What's more interesting is that it's the same as the ones that were supposed to be installed in the factory. And 3 of them. From this you can now calculate the capacity of the current EVA.)"

But that definitely explains why only I seem to remember it.

_____

Framtidsfabriken
 
Last edited:
  • Like
Reactions: 3 users

Rayster

Member
I once asked MT at an AGM if there would ever be revenue generated from the EVA and his answer was “yes. We can’t keep giving it away for free”. I would like to think that once the deals are done the early ramping of output could be achieved using the EVA plant.
 