Currently floating between two exploration projects, one on Peak downs mine doing FY23 Drill preparation (grading pads/diggings the sumps for drill pads) 173 sites, takes the rigs 1 week to drill one core site at around 300m, $14,000 a day
Second project, seismic exploration down at Roma for origin energy, 450sqkm job
Only 19 more days to go before a day off