Azzler
Top 20
Yes I know but I'm pointing out the gap.There have been 4 previous results released to market regarding the extension drilling. They have to go through the lab before AVZ can release them which is why there is a delay between drilling ending and the announcement. This was the final set of results which means the database is complete and it will now be sent to the independent consultants as per today's announcement.
31/10/22 : 4 holes
1/12/22: 4 holes
28/2/23: 4 holes
22/3/23: 5 holes
Large gap here!
Absolute blackout.
Keep all info secret.
30/6/23 : 36 holes. (Blackout over?)