This year, the first to be connected to sewage and fresh water is our factory in the industrial area. Interestingly, only the trees that are necessary will be cut down. After that, we should soon see which plot will be allocated to us.
"Hertsö field, Luleå industrial park
Luleå Industrial Park is the name of the new area where the Hertsö field and Svartön will open up for continued investment in the industry of the future. The area consists of the existing industrial area Svartön and the new area Hertsöfältet. Design of the Hertsö field started in 2020 and Lumire will work gradually with water and sewage solutions, which are in line with the company establishments that are taking place. There are several actors working in parallel with the development of the Hertsö field.
Feel free to read more about the importance of proximity to Luleå Harbor
.
2022-2023 - focus on new pumping station and wastewater pipes
In 2022, the first pumping station will begin construction at the Gräsören Bridge, which is located at the intersection of the old Lövskärsvägen and Gräsörenvägen. In addition, water and wastewater pipes are drawn to be able
to supply the first establishment Talga Resources. For those who move in the area, Gamla Lövskärsvägen will be closed in stages, which means, among other things, that pedestrians and cyclists will be directed to Hertsövägen.
The felling of forests takes place on as small a scale as possible based on clarity about future companies that establish themselves and with regard to seasons and breeding periods. This promotes the ecosystem, and allows the forest to breathe and grow. When it comes to stormwater management, it is carried out in open stormwater systems to be able to purify the stormwater in the ditches before it is discharged into the recipient."
https://www.lumire.se/hertsofaltet-industripark/