Carlos Danger
Top 20
Maybe I've missed something.
Where is this financial claim?
I know the $10 billion has been thrown around forever, but as far as I can see, there is no official reference to a $10 billion damages claim lodged in any publicly available ICSID document or AVZ ASX announcement.
Please correct me.
If somebody has any official document that specifies anything to the above effect please post it. That would be much appreciated. (Dave Evans? He's all over the ICSID case and his preferred course of action was the ICSID route. Maybe he can chime in? or anyone for that matter).
What I can see that AVZ are seeking via ICSID;
The focus of current legal action and arbitration is on restoring mining rights and ownership, not seeking financial damages other than penalties for non compliance.
- A declaration that AVZ (via Dathcom) holds the legal title to Exploration Permit PR13359 at Manono.
- An order compelling the DRC to issue an exploitation (mining) permit over that area.
- Interim measures to protect these rights, and penalty orders due to non-compliance by the DRC.
A "win" will in no way value the resource at 10 billion dollars based on the above.
At the end of the day a deal needs to be done for shareholders to walk away. Before or after arbitration (if it goes the distance). The sooner a deal is done the better in my opinion.
Page 25 @muks mentions penalties of around US$9billion relating to Cominiere so I’m not sure if this is the actual document or source you want.
I do recall AVZ’s compensation from the DRC being between US$8-$10billion but don’t remember the source. Cominiere is 90% owned by the DRC State and the DRC revoked the license through their Mining Ministry and CAMI.
I imagine the compensation of around US$10billion is the amount being claimed by us through DLA Piper
View attachment 87597
But as @Xerof suggested, @Carlos Danger is the best man to ask when it comes to seeking legal information.
Our main claim at the ICSID is for the the restoration of our rights to the tenement and for the Mining Licence to be granted to DathcomSo this is where it gets a little tricky - ICC's power over DRC land transfer and ownership rights is 50/50 from what i can tell. But that is up to the arbitrator, if they do not believe the DRC will follow through, then they pretty weak from what i can tell, but ICC and ICSID for that matter will generally rule for monetary damages as remedy.
this relates to my enforcement showerthought. They aren;t losses unless you sell type of deal, until we request to enforce the emergency injunction.
And for monetary penalties, ICC has jurisdiction over 90% of banking institutions, and can block or hold transactions from ZJ to Cominiere, or any other organiztion to Cominiere to recoup damages.
As the damages claim in that link says AVZ is seeking $6.2b USD in damages for our 75% holding of Dathcom due to the destruction in value of the Manono project
The $2b USD being claimed for Dathcom is for the 25% belonging to Cominiere
The other $1b USD being claimed for the breach of the FROR of refusal by Cominiere and the $394k USD for legal fees takes it up to around $9.6b USD
There is also an undetermined amount for repetitional damage against Cominiere
It is worth noting this is filed in the ICC case against Cominiere but I’d imagine the claims at the ICSID are based on the same math
Also Zijin and Cominiere's claim for damages at the ICC valued AVZ's 75% at around $4.5b USD from memory
So we are seeking both the restoration of our rights and damages if the rights aren’t going to be restored by the DRC
9card once posted (included in the replies) a guide to this where he said:
‘So this is where it gets a little tricky - ICC's power over DRC land transfer and ownership rights is 50/50 from what i can tell. But that is up to the arbitrator, if they do not believe the DRC will follow through, then they pretty weak from what i can tell, but ICC and ICSID for that matter will generally rule for monetary damages as remedy.’
I remember another post where 9card talked about Fasken trying to get DLA to choose restoration or damages but the ICSID dismissed it
So long story short the ICSID will need to look at the likelihood of the DRC following their orders before deciding what to award us
And given the fact that the DRC haven’t put the south back in our name as ordered by the ICSID in January 2024. Plus have failed to engage with AVZ management during the agreed suspension that should have led to an end to the ICSID case with the sale to KoBold. My bet is we are getting the damages of $6.2b USD plus legal fees imo
Last edited: