I like the KISS principle.
AVZ's JORC compliant
lithium reserves at Manono are,
- Total = 842Mt @ 1.61%
- Roche Dure (RD) = 669 Mt @ 1.61%
- Carriere de l'Este (CDL) = 173 Mt @ 1.58%
KoBold acknowledges the need for fair compensation for AVZ's Roche Dure (RD) and Carriere De l'este (CDL) investments at Manono. Kobold says RD is worth $US3.0 billion, and presumably the DRC govt is on the hook for compensating AVZ for CDL.
CDL represents 20% of Manono's JORC reserves (ignoring the differences in grade and impurities), which adds another $US600 million to the mix.
Therefore the
starting point for negotiating AVZ's Manono stake is KoBold's low-ball $US3.0 billion plus the DRC's $US600 million =
$US3.6 billion. This is a long way from AVZ's ICSID claim for
$US6.2 billion for the corrupt destruction of its Manono investments by the DRC government and its agencies.
The mid-point of the two figures is
$US4.9 billion.
Over to you KoBold and DRC...
Cheers
F
PS. I am unaware if AVZ's other tenements and projects alongside Manono are also being negotiated, or what, if any value AVZ has placed on them.