cruiser51
Top 20
Have you ever seen her not looking stoned?
Must run in the family, her claim to fame is, she is royal, maybe that explains.
Maybe she has been on a permanent high lately, due to constantly increasing bank account.
Have you ever seen her not looking stoned?
Don't know about her but wish to fuck I was. No one could call me a" the nige" fan. but under the circumstances with all this insidious social media bulshit here and in the drc I don't think all this disclosure crap ( including by me) is doing us any good. If or when it's rooted we'll have plenty of time for the parasite lawyers to get involved. Cheers and try and have a great chrissy.
I have done a DG, so he doesn't know who I am.Jonno is on our side…. Lars is klaus fuckoff…. He blocked me early on![]()
Hyenas gonna hyenaIt's amazing the team, Lars, Wolf8, Chewy, Bombersmadd (who deleted his account on twitter, but certain things can still be seen, lol, fukhim, wanker), Stalin, TommyR, Spec Capital, Hakuna Matata, Unpaid Downramper, just to name a few, what a team!!
Chewy's reaction was funny, when I pointed a few things out to him, but in my eyes highly sus, still trying to suck Franck and Jonno in with his leading gut wrenching comments , just another absolute loser.
Highly likely lives under a rock.
I have had a thought about her visible predicament and am convinced she has her secret admirer sitting under her desk.
The illegal delay by CAMI is 100% about the 'disputed' northern part of PE13359. Not ownership.Another indication that the statement, that cami need so much time to calculate without having a reason for, could maybe be wrong.
You all remeber that i said acaj posted in may/june that the ICC cominiere vs. MMCS have settled with help of the government?
I didn't think it was that exact date.
AVZ beginning of Suspension from official quotation: 11 May 2022
Acaj posted settled dispute between Cominiere and MMCS on: 11 May 2022
Annoucement of Arbitration from Zijin: 11 May 2022
You don't need to be sherlock holmes to get the feeling there might be a connection.
What i think will be some possible steps (it's just my thoughts i don't claim that there is a connection or that my statements are true):
1. we need to solve the problem with MMCS
-through a deal with MMCS
-or need to go against cominere and mmcs with a international arbitration process. which of course could take years, and like I said...time is not our friend
-the DRC rule against it but i really doubt it
2. we maybe need to solve the problem with Zijin
-through a deal
-winning or loosing the ICC....problem again, it could take years
-or maybe not to much important for the ML when we solve it with MMCS and Cominiere can cede 10% to the state, but who knows
I believe the 10% cede to government could be the real problem, when this is the case (personally i believe in it to 99.99%, but you don't need to think the same and all of you can of course build your own opinion), then we could have a problem which could take a long time to solve.
But maybe, AVZ can cede 5% for the moment and cominiere 5%, but of course I have no idea if that violates any part of the jv contract and if it is not possible. Then cath just have 4% for the moment+ pre offtake agreements???? Again, who knows.
It all could be the absolut clusterfuck, but maybe there is a "easy" solution.
A little different glimmer of light occurred to me, even if there is a little chance that we loose 13359 one day. we have 100% of 4029 & 4030. The pegmatite in the SW area will not as good as Roche but perhaps after 5-7 years we have our money back. an advantage until then: the chinese then probably built the infrastructure around manono
Just a joke, God save us from this shit please!!!!!!!!
View attachment 24868
AVZ are the majority shareholder of Dathcom. We control the project. We will have at least 51% no matter what so ownership is not an issue for the mining licence.Of course it could be the reason too. I hope we will find it out in the not to distant future. And watch out in the end both problems are the reason for it![]()
Would a mining licence for PE13359 that covers a perimeter of the entire 221 carrés that Dathcom are legally entitled to require a new ministerial decree?What i don’t understand in that case, when the final decree is about a PE of that circa 130 fraom 221 quadrants ( don’t remember the right number), it definitely need a new exploration license area with a new number for the nothern exploration part. So why did we get no mining license and work out the new jv relationships at the same time? Or is it possible to take out a certain part within a license transform it in a PE and the rest is a PR with the same License number? From a bureaucratic Point of view it seems illogical to me.
If Dathcom have successfully retained the northern part of the tenement for the PE then there might need to be a new decree or an amendment to the existing decree currently covering 139 carrés to legally give them the entire area covering 221 carrés.You mean the company have a problem with the ministerial decree of the 139 quadrants, because cami gave the technical decree for the complete 221? That would mean the MoM made a mistake or had the instructions to do. Or why did she reduce the quadrants for the PE? In this case i think we need of course a new decree from the minister of mines about the 221 quadrants when the company is fighting for it and thats the reason we still have no ML. But that would mean we have to go against that decree to change it for the complete area?
Many good points there SchussConclusion....it looks like we have two different main problems. That we at least know about.
The ownership issue and no 10% left to cede it to the state. The 5% MMCS were not a problem at the time nigel gave the interview about to maybe give 15% to the state. In my opinion, the management did not expect cominiere to give up the 5% to MMCS. AVZ had already won several times against MMCS and Cominiere would violate the jv agreement again.
And our Nothern part. It would be important to know if the management fell for the trap and confirmed the "wish of the president's request" in a letter that they give up a part or are willing to enter into a new jv. In the end it was perhaps also a trick to accuse avz of violations in order to be able to contest the whole area, which could fit in one point as cominiere has already formulated in their letter to question avz or to claim the 60% in a international arbitration. If based on this fact there really is a chance to revoke the license from avz, i wonder where the president's help is. And would be deeply amazed by the associated stupidity of our management not to ask beforehand whether if its was actually true. If avz never formulated this letter i think we are on the safe side. If not, and its possible that they make a mistake it has caused massive damage, for which their maybe could certainly be liable one day?
On the other hand i think the management must have promised it in some way? Otherwise why would it happen without a basis? Why is the ministerial decree only 139 quadrants of 221? Why is in the decree a new PR formulated? Why would ajn stated it to acquire on 1 november on the tsx?
One thing is mysterious, on the 30 November Ajn stated again: "an area located in Tanganyika Province that is prospective for lithium and that originates from the partial relinquishment (which is disputed) of exploration permit number PR 13359"
And is there any evidence that mupande is spreading lies on behalf of the president? If so, why hasn't action been taken against mupande after 8 months? Is the president part of it or was it really just a mistake by the management? Or have they done it the same way they sell to zijin without any legal basis and give a fuck about the laws? In this case i wonder, is it possible to bring an entire government before the International Court of Justice? To sue them for damages? Could be maybe more than the drc has available in a year. But maybe its a good sign that ajn stated a month later under dispute, to save their faces?
As you can see, what happened raises a lot of questions. And creates a lot of speculation possibilities. And again, hopefully we find out in the near future what is the truth. And hopefully everything goes in our favor.
seems to me that Felix of CAMI took a personal view (influenced by other parties?) that as AVZ had 'only' worked on a small portion of 13359, it seemed only fair for them to be decreed 133 of the 221, and so started the lies and farken aroundAVZ are the majority shareholder of Dathcom. We control the project. We will have at least 51% no matter what so ownership is not an issue for the mining licence.
The amount of carrés is the missing number in Mupande's surface rights calculations
View attachment 24869
'Wirklich falsch informiert! Auf einem 13 km langen Pegmatit-Trend hat AVZ „ein Vermögen“ ausgegeben, um diese „harte Arbeit“ auf nur 1,3 km zu leisten, um diesen sogenannten wertvollen Vermögenswert freizusetzen. Hat AVZ Anspruch auf die restlichen 90 %?'