Xerof
Flaming 1967
My understanding is if you do nothing on a PR tenement over the 5 years, you automatically lose 50% on renewal. This is what happened to 4029 and 4030. Fine, and legal. This is not the case on 13359 - AVZ have applied for the PE well within the timeframe and in so doing can expect to be granted the PE over the entire tenement.Uncertain whether AVZ does have full legal right to CDL?
Have they done suffient drilling to develop that part of the Manono Project to have it included in the surface rights.
One for Momentum and Nigel to explain what exactly in the DRC MINING CODE specifically mentions regarding appropriate spending $$ and specific time to frame to continue to hold rights.
Is there a legal loop hole that CAMI DG is using to support actions that lead to AJN applying.
Agree with Wombat get the ML for Roche Dure and part of CDL and progress to mining.
IMO, the only legal loophole is the fucking arsehole DG of CAMI thinks he can do what he fucking likes. Cunt
There appears to be something wrong
Last edited: