I actually emailed this morning the company and asked what was happening at the MP Power station.
I mentioned the article posted by AVZ on twitter, the article posted by Tantalex on twitter and the progress photos appearing on twitter.
I explained I had concerns about this.
About 1.5 hours later the AVZ's latest twitter post appeared.
In the twitter post in English:
2. Memorandum of understanding
On January 13, 2020, a Memorandum of Understanding (MOU) was signed between the DRC (MHRE) and AVZ POWER SAU.
Objective: rehabilitation of the Mpiana Mwanga I and II hydroelectric power stations as part of the implementation of the joint venture contract, led by AVZ INTERNATIONAL LTD and signed between them, that is to say, between companies COMINIÈRE SA, AVZ INTERNATIONAL LTD, DATHOMIR MINING RESOURCES SARL and DATHCOM MINING SA,
not only for the exploitation of the lithium mine but also for the electrification of Manono and its surroundings.
The memorandum of understanding stipulated the responsibility of the AVZP to carry out a definitive feasibility study (DFS).
AVZP also obtained a baseline Environmental and Social Impact Assessment (ESIA) in September 2020, a prerequisite for proceeding with the DFS.
Who is actually saying that Zijin is refurbishing the MP Power house for Zijin?
What is Franck saying?
I thought asking the company is a better way than spinning out control, talking shit and suffering a nervous breakdown.