I guess Nigel must be itching to release the BFS Bankable Feasibility Study, which we didn't see yet.I remember that Nigel mentioned before our suspension that the BFS is nearly complete and will be released after the mining license is granted. The latest DFS was from April 2020 and was based on....In 2020 AVZ’s targeted annual production was 700,000 tonnes of SC6 (lithium / spodumene concentrate) which equates to over 100,000 tonnes of LCE (lithium carbonate equivalent) annually. That’s at least 33% more than what Arcadium is producing from its mines
That’s back when AVZ was targeting mining 4.5Mt of ore annually, then they looked at expanding to 10Mt annually so you can take that 100,000 tonnes of LCE annually and more than double it to over 200,000 tonnes of LCE annually
With all the drilling after the 2020 DFS a 10 Mt / per year operation is definitely on the cards. I would imagine the BFS would be a nice carrot to dangle in front of Kobold when it comes to negotiations......otherwise