Thunderpony
27 µg per 100 mL
What the actual fook!
Now that's interesting...
@Matza22 perhaps she needs some more reminders.Now that's interesting...
She's also formerly the Director of Energy Transformation.
I assume she's already familiar with our side of the story if she's at the stage of now visiting there in person
They think they are sly, but these absolute champions aren't fooling anyone in their poor fitting suits.Everyone at that table is giving the 'this cunt for real?' look.
Everyone at that table is giving the 'this cunt for real?' look.
All 3 from Cominieres x account.Absolutely, and she’s sitting directly opposite him and she’s not smiling in that photo. Can you give us the link to the photo / article
He just explained how he stole US$50 Billion with protection of his president.Everyone at that table is giving the 'this cunt for real?' look.
Hang in there friend!....Celebrate tonight and enjoy the wedding and the weekendWell it's only 8.30 pm here in Java but went to a great ozzie wedding of my nephew , banyak beer ,wine, vodka ( I bring my own home brew vodka ) sorry no jokes tonight but so many above posts I classify as a joke . I don't trust USA if you think they will help well delusional thinking im pissed but not stupid this company I will see all the way to my grave before we get a result , my thinking but DYOR as they say no results for years and no payments for many years to come , I waited for 7 years for a clients payment in oz for incompletion of contract and they were not Chinese , hopeful but fading per the month
with a slight look of, i wonder if he will fuck us like he fucked AVZ to their eyesEveryone at that table is giving the 'this cunt for real?' look.
Looks like Manono Lithium (Cominiere/Zijin) didn’t get the memo to cease all activities on our 13359 tenement as they’re advertising for tenders now for construction - it’s a long article so I’ve just posted the first para.
Société MANONO LITHIUM SAS : Phase de prospection de Manono Lithium SAS - Travaux de la construction et l'installation d'un site logistique, la construction et l'installation d'un site de production d'énergie solaire, la construction et l'exploitatio
发包编号:MNNLY-GC-202400830 AAO N0: MNNLY-GC-202400830 马诺诺锂业探矿阶段--物流场地建筑安装工程、太阳能发电场地建筑安装工程、200吨每小时碎石生产系统建设及运营及供水井工程施工招标公告 Avis d’appel d’offres : Phase de prospection de Manono Lithium SAS - Travaux de la construction et l'installation d'un site logistique, la construction et l'installation d'un...www.radiookapi.net
Company MANONO LITHIUM SAS: Prospecting phase of Manono Lithium SAS - Construction and installation of a logistics site, construction and installation of a solar energy production site, construction and operation of a 200-ton-hour aggregate production system and construction of water supply wells
Published on Tue, 20/08/2024 - 10:51 | Modified on Tue, 20/08/2024 - 10:51
Share
tweet
FACEBOOK TWITTER linkedIn WordPress Messenger WhatsApp Skype Viber Messagepinterest e-mail
发包编号:MNNLY-GC-202400830
AAO N0: MNNLY-GC-202400830
马诺诺锂业探矿阶段--物流场地建筑安装工程、太阳能发电场地建筑安装工程、200吨每小时碎石生产系统建设及运营及供水井工程施工招标公告
Notice of call for tender: Manono Lithium SAS prospecting phase - Construction and installation work of a logistics site, construction and installation of a solar energy production site, construction and operation of a 200-tonn-hour aggregate production system and construction of water supply wells
马诺诺锂业简易股份有限公司,商业和动产登记证书号:NCD/LSH/RCCM/23-B-01276,国家身份识别号:N05-B0500-N27040M,税号:A2315586S,注册地址:刚果民主共和国卢本巴希市�� 因公司业务开展需要,现对马诺诺锂业探矿阶段--物流场地建筑安装工程、太阳能发电场地建筑安装工程、200吨每小时碎石生产系统建设及运营及供水井�
The Company MANONO LITHIUM SAS, registered at RCCM:NCD/LSH/RCCM/23-B-01276, ID. NAT.:N05-B0500-N27040M, NIF: A2315586S, whose registered office is 11B, Avenue de la Ribambelle, Annexed District, Municipality of Lubumbashi, City of Lubumbashi, Democratic Republic of the Congo. Due to the development of the Company's activities, this call for tenders on "Manono Lithium SAS prospecting phase - Construction and installation work of a logistics site, the construction and installation of a solar energy production site, the construction and operation of a 200-ton-hour aggregate production system and the construction of water supply wells" has been launched.
And of those 9 countries how many will not take a bribe , really ? USA to the rescue I doubt that very much , they look after number 1 only, themselves , don't ever kid yourself if there is nothing in it for them it is ignored or they would be already talking to them about AVZ not rail links etc .