Trail mine is long over and I believe the land has been restored to prove it's possible to restore the land. I'm not certain on the trail mine volume but my head remembers 27kt of ore, enough for 6t Talnode-C
 
  • Like
Reactions: 3 users
Hi All, Can someone confirm if we are still producing from the ‘trial’ mine over this summer? And if so what volume? And finally how much stock pile do we have?
Thx 🙏

Trial mine is closed and being rehabilitated with the re-moss project. Nothing more coming out of the ground until 2027.

The stockpile should be enough for 5000-6000t of anode material.
 
  • Like
Reactions: 3 users

ACinEur

Regular
Thank you both…Need to get my head back into the game on TLG. 🙏
 
  • Like
Reactions: 1 users

beserk

Regular
I will be doing my annual pilgrimage to Arctic Sweden in two weeks time. This coincides with the final snow melt and seeing the back sides of the fleeing Talma reindeer herds. They and their motorised herders will have vacated the area around the graphite mine site by now.
Will visit the Nunasvaara mine site when I am visiting my relatives in Vittangi. And to hopefully ascertain if there is any preparation for further mining taking place for the first limited off take.
Happy days!!
 
  • Like
  • Love
Reactions: 8 users

cosors

👀

"Nyobolt raises $30m for AI datacentre power​

News | April 16, 2025
...
This will accelerate the advancement of Nyobolt’s proprietary Niobium and tungsten-based oxide battery anode technology to move into AI datacentre backup power systems as well as EV, electric trucks and industrial robots.

The technology can provide up to 20x more power than traditional lithium ion cells with a 20C charging rate to charge in minutes and cut downtime for even the most power-intensive applications. The tungsten is sourced from Germany and the niobium from Brazil, avoiding the issues of sourcing cobalt and nickel for NMC cells.
..."
 
  • Like
  • Fire
Reactions: 7 users

cosors

👀
I will be doing my annual pilgrimage to Arctic Sweden in two weeks time. This coincides with the final snow melt and seeing the back sides of the fleeing Talma reindeer herds. They and their motorised herders will have vacated the area around the graphite mine site by now.
Will visit the Nunasvaara mine site when I am visiting my relatives in Vittangi. And to hopefully ascertain if there is any preparation for further mining taking place for the first limited off take.
Happy days!!
The material is stored in these two halls:
1747307743934.png


1747307789548.png

 
  • Like
Reactions: 1 users
Top Bottom