Dathcom Exploration & Exploitation Maps

02/01/2023
@Sammael
@Frank
@Winenut
@JAG
@Mr Inappropriate


These are the latest PR and PE licenses from Cominiere’s 2023 site. There have been a few changes but I can’t remember exactly what has been changed as I deleted past copies I had. It looks like changes have been made to Minocom for one. Unfortunately the copy and paste picture isn’t as good as the picture on the website:

CODETYPEOBSERVATIONJV EN COULEUR
12202PEDECHUMANOMIN
12203PRSEGMAL
12204PRSEGMAL
12205PRSEGMAL
12206PRCOMINIERE
12436PRDATHCOM mining SAS
12437PRCOMINIERE
12438PRUATT
12439PRUATT
12440PRUATT
12441PRUATT
12442PRTANbGANIKA
12443PRSOMIMI
12444PRSOMIMI
12445PRSOMIMI
12447PRUNITED COMINIERE SAS
12448PRUNITED COMINIERE SAS
12449PRDATHCOM mining SAS
12450PRDATHCOM mining SAS
12452PRLOND HAO COM
12453PRCOMFORCE
12454PRDATHCOM mining SAS
12455PRUATT
12456PRSOMIMI
12457PECOMINIERE
12458PRTANbGANIKA
12459PRDATHCOM mining SAS
12460PRUNITED COMINIERE SAS
12461PRCOMINIERE
12462PRUNITED COMINIERE SAS
12463PRCOMINIERE
12707PRMURUMBI mineral
12708PRMURUMBI mineral
13065PESEGMALE
13244PEUATT
13245PEUATT
13246PEUATT
13247PECOMFORCE
13348PRMINOCOM mining SAS
13359PRDATHCOM mining SAS
13698PERMINOCOM mining SAS

© Copyright La Cominière SA 2023
Thanks again @MoneyBags1348 for curating these threads. This place will fucking explode when the magical letters “PE” appear next to 13359.
 
  • Like
Reactions: 3 users
  • Like
Reactions: 1 users

Xerof

Biding my Time 1971
Screenshot 2023-05-26 at 7.13.10 PM.png



Stardate 26 May 2023, a few weeks after some fuckwit changed it from DATHCOM
 
  • Like
Reactions: 2 users
@Frank and @Winenut …. You two are the only people I know who would know for sure what is wrong with the following map. Lets hope the new DG of CAMI can correct it

IMG_5322.jpeg
 
  • Thinking
Reactions: 1 users

Winenut

Go AVZ!
@Frank and @Winenut …. You two are the only people I know who would know for sure what is wrong with the following map. Lets hope the new DG of CAMI can correct it

View attachment 41738

That should be the right one I think MB but the current interested party on the CAMI website is Comminiere

As per this

1691661951034.png


Might not be a bad thing as it can open the way for the full 221 Carre of the Manono tenament to ultimately be recognised correctly with Dathcom as the interested party (no longer split into north and south as per the corrupt actions of Mupande)

The one thing that bothers me ....and has for ages....is that none of the information I have seen (irrespective of the interested party noted) includes "Tin" or "Cassiterite" :unsure::unsure::unsure:

I really don't get that bit....
 
  • Fire
Reactions: 1 users
That should be the right one I think MB but the current interested party on the CAMI website is Comminiere

As per this

View attachment 41743

Might not be a bad thing as it can open the way for the full 221 Carre of the Manono tenament to ultimately be recognised correctly with Dathcom as the interested party (no longer split into north and south as per the corrupt actions of Mupande)

The one thing that bothers me ....and has for ages....is that none of the information I have seen (irrespective of the interested party noted) includes "Tin" or "Cassiterite" :unsure::unsure::unsure:

I really don't get that bit....
Bingo…. And there you have what I thought you and @Frank would pick up on, as Frank would say “Don’t forget the Tin”

I’m hoping the new DG of CAMI will realise and add it to the PE
 
Last edited:
  • Like
Reactions: 2 users
08/09/2023
 

Attachments

  • IMG_5482.jpeg
    IMG_5482.jpeg
    1.7 MB · Views: 83
  • IMG_5481.jpeg
    IMG_5481.jpeg
    1.7 MB · Views: 90
  • IMG_5480.jpeg
    IMG_5480.jpeg
    1.2 MB · Views: 82
22/10/2023
Latest CAMI Maps



Screens 2023-10-21 153815.jpg

Screenshot 2023-10-21 152447.jpg

Screenshot 2023-10-21 152814.jpg

Manono_ManonoExtProjectOverviewv4.jpg
 
  • Like
Reactions: 1 users
22/10/2023
IMG_5659.jpeg


IMG_5660.jpeg
 

Attachments

  • IMG_5658.png
    IMG_5658.png
    4.2 MB · Views: 90
  • IMG_5660.jpeg
    IMG_5660.jpeg
    322.5 KB · Views: 71
Last edited:
  • Like
Reactions: 1 users
23/10/2023

Hey can someone who has taken screenshots of the cami portal or a sharp memory check it out again.
Looks to me like it’s changed again.
Cant find mention of Manono Lithium on it today and area looks to have changed again on 13359.
Was updated the 22nd apparently.
Multiple results, click on 'Application 15775'

Carlos Replied

Defo still there
20231023_105041.jpg


Marksmann007

Ok so it is when using 15775 in the search bar it’s still there.:cautious: When I put in 13359 and check out the surround tenements it doesn’t show Manono lithium.

Remark

1698019388300.png



Scoota30

Did you use the search bar for 13359? If you click on the northern section it shows 13359 laying over the top of the new application - you may need to click the application in order to open that one up

1698019582652.png



Cruiser51

1698022378295.png
 
23/10/2023
9cardomaha posted


Franck Fwamba hearing proposed Nth split of "our" PR13359 to "Manono Lithium" is Chinese.

Its Zijin (under the subsidiary JING XANG) and Cominiere who established the JV Manono Lithium. It is a 39/61 split in favour of ZJ - the tenement is 125 carres carved out of 13359 and applied for under a new PR 15775.
 
24/10/2023
9cardomaha replied to Carlos

ICC be damned because part of the deal is Zijin withdrawing their claim on 15% of Dathcom and using the 33.4m to pay Cominiere for the north. Unless they are trying to get that 15% for free now. This was the exact terms of the original offer by Zijin.

'According to the joint venture agreement signed by Jinxiang Lithium and COMINIERE, after the Project Company acquires the exploration rights numbered PR15775, COMINIERE agrees to directly deduct the purchase price of USD 33.44 million for the 15% equity in Dathcom from the amount payable by Jinxiang Lithium to obtain a 61% equity interest in the Project Company.'
Click to expand...
Click to expand...
So they want a refund on the 15% from Dathcom and then use it to get 61% of 125 carres?
 
24/10/2023
Carlos Posted

Fun fact Zijin brought the ICC case and can drop it anytime they want. And the MoU deal will lead to the dropping of all litigation against the DRC and its controlled entities so that means no Cominiere ICC case. Relevant disputes refers to control of Mpiana Mwanga imo

'According to the joint venture agreement signed by Jinxiang Lithium and COMINIERE, after the Project Company acquires the exploration rights numbered PR15775, COMINIERE agrees to directly deduct the purchase price of USD 33.44 million for the 15% equity in Dathcom from the amount payable by Jinxiang Lithium to obtain a 61% equity interest in the Project Company.'
 

Dave Evans

Regular
29/10/2023
Retrobyte Posted


Sharing a quite balanced article out of China that a couple of the lads here tracked down .....

https://xueqiu.com/1291909236/264441801

Published on 2023-10-25 14:19
from snowball · Jiangsu

Manono lithium mine shuffle,Zijin Mining receives equity rebalancing​

Walking Stone2023-10-24

$Zijin Mining (SH601899)$ issued an evening announcement yesterday,The company was invited to lead the exploration and development of the world-class lithium mine Manono Northeast Project.It is understood,Manono lithium mine PR13359 exploration rights have been returned and registered to Cominiere (Congo Mining Development Corporation)under one's name.According to the joint venture agreement between Zijin and Cominiere,The two parties hold the northeast part of the exploration right through Manono Lithium.(Exploration Rights No. PR15775),Among them, Zijin Mining holds 61% of the equity of the joint venture.,Cominiere holds 39% interest.

It was noted that Zijin Mining, which has always been strict in information disclosure, used the following words in its announcement:"Northeast part of the mining rights project",rather than the Northeast"A certain project".alert immediately,Mining rights were split!Some friends in the industry asked about this on WeChat,I took some time out from my busy schedule to type out a few paragraphs of text..

1-Significant reshuffle and division of mining rights.The original PR13359 was split into two,Cominiere acquires flagship resource area,Zijin obtains the best prospect exploration area in Northeast China.

The original outer exploration rights of Manono’s northeast extension and southwest extension were randomly cut up.,Congolese environmental and mining consultancy to divide outer extension; AVZ only retains the external extensions after castration,And its mineral rights are surrounded by exploration blocks of the Congolese Environmental and Mining Consulting Company.

18b657af9688ffef3fc4c9ee.jpg!800.jpg


18b657afa0a8fff03fe2e288.png!800.jpg




The two pictures above reflect the aftermath of the Manono incident,The mysterious operation of mineral rights changes in core areas.The original PR13359 was split into new PR13359 and PR15775,The former is owned by Cominiere,The latter is controlled and dominated by Zijin Miningthrough cooperative companies.The original peripheral PR4029 and PR4030 were cannibalized and divided.,AVZ currently holds only the yellow area in the picture above,Congolese environmental and mining consultancy holds green zone.

2- The flagship mining right PR13359 was taken back by the government,The discovered core lithium resources are fully controlled by Cominiere.

Although the project is called Manono,However, the resources discovered by AVZ exploration are actually in the Kitotolo Pegmatite Belt.,rather than the Manono pegmatite belt.Areas where AVZ has carried out extensive exploration discoveries and submitted resource estimates in the past,Strictly limited to the lower left corner of the picture below,That is, in the Roche Dure pegmatite in the southwest area,The resource estimation results are shown in the table below.

18b657affee88b023fe733c8.png!800.jpg


18b657afe0b8fff13fe3653f.png!800.jpg


3- PR15775 controlled by Zijin Mining does not include proven high-grade lithium ore resources,However, the exposed Manono pegmatite zone,In addition, AVZ’s past exploration has already discovered mineralization through drilling.,Exploration prospects are very good.

18b657b005688b033fda5460.jpg!800.jpg


According to AVZ official website information,The MO17DD007 borehole constructed as early as 2017 discovered ore thickness of up to 251 meters in the Carriere de I'Este pegmatite in the Manono pegmatite belt.,Li2O grade is as high as 1.48%,Mineralization at 913 ppm tin grade.

3- Zijin Mining’s previous deal to purchase 15% of Dathcom’s shares was completed"reconciliation",The acquisition price of US$33.44 million was directly used to obtain 61% of the equity consideration of the PR15775 exploration rights project company..Zijin Mining becomes one of the foreign-funded enterprises that invested in the original Manono project,So far the only company that has received equity rebalancing.

4-Commentary and analysis of future trends of the Manono lithium mine incident:

Zijin Mining has occupied the mining news attention of Chinese people for nearly two months.,First, PNG’s Porgera gold mine won new mining rights,Then the investment in the Manono lithium mine project was rebalanced and equity repaid,Demonstrate the ability of large international mining companies to respond to and resolve national risks.

This operation of the Democratic Republic of the Congo government is quite outrageous; Obviously there is someone behind the scenes to help; Both sides, Can advance or retreat!

Government-related transfer of 15% stake in Zijin Mining received amicable settlement and equity rebalancing payment.The core lithium ore resources discovered by the original AVZ are classified into the new PR13559 and are controlled by Cominiere,Not moving for now.One side can still continue negotiations with the Australian government or AVZ listed companies with strong international influence,On the one hand, we can still wait quietly for the outcome of the international arbitration in Paris..after all,Under strong diplomatic pressure from the Five Eyes alliance countries,The Congolese government will not make any rash decisions in the short term..This leaves a way for AVZ to regain the Roche Dure core mineral resources of the Manono project in some way in the future..

Due to settlement and equity rebalancing,Zijin Mining seems to have temporarily withdrawn from investment in the core Roche Dure lithium mine.,Of course, we do not rule out seeking investment in the future..But to some extent,Zijin Mining currently occupies a favorable track.Obtain very favorable prospecting rights,And won the development rights of hydropower stations in the region,The highway to Manono is also advancing.Zijin Mining is racing against time,If PR15775 obtains exploration findings as soon as possible,and build the mine quickly,In the future, obtaining the development rights of the core resources in the new PR13559 will occupy the first-mover advantage..

AVZ is under great pressure now!From a legal perspective,The current embarrassing situation is that the mining rights of the projects that were originally controlled have been divided and divided, leaving only the useless narrow corridor of the second ring road.,and surrounded by three peripheral rings controlled by Congolese Environmental and Mining Consulting Company.Faced with capital market shareholders again"Inadequate, timely and transparent disclosure"Waiting for prosecution.same,Today’s ASX disclosure still did not mention the latest mineral rights split and split..

The future of the Manono lithium mine remains unclear.Reconciliation of the dispute over the transfer of 15% equity of the original project company,Removes obstacles for AVZ to assert reasonable expectations of its future 66% stake.Have a premonition,The Congolese government is eager to seek political and economic support from the West,At the same time, due to political pressure from the United States and other Western countries,,It is likely that the new PR13559 will eventually be subjected to a series of harsh conditions"transfer"at AVZ.

Sure enough,Zijin Miningis likely to be able to protect its interests in it
 
  • Like
Reactions: 1 users

Dave Evans

Regular
30/10/2023
Carlos Posted


@Winenut posted this a week ago
1697847367986.png


I don't have a satellite version but here is a breakdown of the old split from Dathcom's waiver application for comparison

20231030_093758.jpg
 
  • Fire
Reactions: 1 users

Dave Evans

Regular
07/12/2023
Carlos Posted

AJN claiming to have the right to the North of Manono. A lot of the info in this is based on AVZ previous work. They dont even have the permit to drill yet.

View attachment 51511
Click to expand...

The AJN tenements are not within 13359. They are along the Manono pegmatite trend to the north east. He talks about the application for the north of 13359 at the beginning but says nothing has happened because of 'political interference' lol

20231207_144149.jpg

20231207_144232.jpg

20231207_144319.jpg
 
  • Fire
  • Like
Reactions: 2 users

hedrox

Regular
screen shot from 20.06 2023......if that helps
Screenshot 2023-06-20 at 09.24.45.png
 
  • Like
Reactions: 2 users

Xerof

Biding my Time 1971
Thanks vm, and given the screenshot was June, then the imagery date is 'Americanised' and is 8 May 2023
 
  • Like
Reactions: 1 users

Dave Evans

Regular
Google Earth Map From 08/2023
1713238766039.png



Older CAMI Map
1713238917115.png



Older CAMI Map Showing Core Library
1713239028566.png
 
Last edited:
  • Like
Reactions: 3 users

hedrox

Regular
The newest image from Google earth is exactly the same as the older screen shot I posted, same cars, same buildings.....but I think they didn't update to the newest image yet....
My guess there will be at least some other vehicles around.....probably with Chinese writing on it...:devilish:
 
  • Like
Reactions: 2 users