Space Cadet
Regular
Bascom Hunter 3U VPX? 1500 instead of 1000. Any chance.Hi Bravo,
This is a real sign of life.
Would the real Akida 1500 please stand up.
Apparently the Akida 1500 we had grown to know and love was just the reference version. Essentially the original version of 1500 was just a cut down version of Akida 1 without the ARM Cortex, so it looks like there has been some changes in the circuit design to necessitate a new tape-out.
The Akida 1 datasheet now "supports" 128 MACs per node, (4*4 MACS). The inclusion of MACs in the design has only been public since the advent of TENNs, but the Akida 1 datasheet does not mention TENNs capability. Does this mean that the original brilliant SNN NPU has been outshone by MACs?
1500 is cheaper than Akida 1 because it does not entail the ARM Cortex licence and because it has a smaller wafer real estate footprint (also because of the lack of the Cortex) meaning more chips with your wafer.
1500 is processor agnostic. It can be used with any MCU/CPU/GPU.
The press release refers to "Moving to volume production" as a strategic step, and this suggests to me that the tapeout is not just for a single customer.
The strong customer demand (military, areospace, medical, wearables) suggests that the 1500 IP is to be used either as a standalone chip/chiplet, or as part of a NSoC which does not include the ARN Cortex.
Frontgrade is proposing to make its own NSoC, GR801 including Akida 1 IP with RISC-V CPU, but it would presumably need the new volume production Akida 1500 IP, so the tapeout will support the GR801.
Onsor is another potential customer that we know about.
I would guess that the micro-Doppler radar (RTX/ISL) would require the higher precision of 8-bit or 16-bit), but there are many other applications for 1500.
This bit suggests the IP only business model was overambitious, and Sean's initial assessment of Akida 1 was off the mark:
"As the market matures, and partners become more deeply integrated into the ecosystem, it is expected that a portion of this demand will transition into an IP licensing model."
The timeline of Q3 2026 is a bit deflating.
SC