Media

cosors

👀
What other players have filled that spot?
I've struggled to find other companies selling additives in mass. I went looking after reading this comment on HC:

It's kind of a catch 22. Either other players have moved in to fill that spot, or they haven't and that's because there's something fundamentally challenging that's so far prevented it from happening?

I encourage anyone who's well researched on this to share their 2c, if you would like to help me out.

_____________

That aside, I really want to see a concrete offtake/supply agreement to be put at ease and know these customers mean business.
We've been hearing "We have very high customer interest and demand continues to grow" for multiple years now. If that can't be converted into sales then it loses all meaning.
Maybe search here for Sila or Group14 (silicon coated).

Solid state (post at HC) is something that has been talked about solidly for many years, there have been countless announcements of breakthroughs. I'll believe it when I see it. I'm probably one of the least knowledgeable of us on the subject, but we only need to skim what's written here to get an idea. As far as I know, the increase in volume is the crucial problem. And I seem to remember that roller wear is enormous and therefore production costs are very high.
But that is only half knowledge, but practically worth as much as the sensational announcements of great breakthroughs.
CATL wanted to deliver go into production last year at the latest. The world has heard nothing more since then, except for Sodium as the next story.
What about Quantumscape?






Screenshot_2025-05-09-10-08-49-05_40deb401b9ffe8e1df2f1cc5ba480b12.jpg


Oh, I forgot, it's not that I have no idea, it's that I know what I'm talking about, having worked in the industry for many years. I almost forgot about that. My Quantumscape shirt is still lying around somewhere 😅

I'm only joking. Please don't take this seriously.
I think it's a lot simpler than most people think. In the end, the price decides what is possible in which product.
I'm curious to see whether solid state, if it ever becomes commercially available, will be able to recoup the billions in research money that have been burnt so far, or whether it will only be for the premier league and show what is possible when costs don't play a role.

____
I think the packaging and casing/housing of the cells alone, with the thousands of charging cycles and thus increase in volume, is a challenge which, apart from the breakthroughs in chemistry, is reported little or nothing at all. Why not?
 
Last edited:
  • Like
Reactions: 3 users
What other players have filled that spot?
I've struggled to find other companies selling additives in mass. I went looking after reading this comment on HC:

It's kind of a catch 22. Either other players have moved in to fill that spot, or they haven't and that's because there's something fundamentally challenging that's so far prevented it from happening?

I encourage anyone who's well researched on this to share their 2c, if you would like to help me out.

_____________

That aside, I really want to see a concrete offtake/supply agreement to be put at ease and know these customers mean business.
We've been hearing "We have very high customer interest and demand continues to grow" for multiple years now. If that can't be converted into sales then it loses all meaning
Tim, yes we have a concrete batching plant onsite, but I think they should maintain the focus on graphite mining and anode production. I'm sure once our plant is built it could be utilised to help others build in the Lulea Industrial Park.
🤣
 
  • Haha
Reactions: 1 users

Tim

Member
Tim, yes we have a concrete batching plant onsite, but I think they should maintain the focus on graphite mining and anode production. I'm sure once our plant is built it could be utilised to help others build in the Lulea Industrial Park.
🤣
Haha, agreed. That took me a moment :ROFLMAO:
 
  • Haha
Reactions: 2 users

Manual

Member

Talga Group signs multi-year offtake deal with Nyobolt for Talnode-C graphite anode​

Go to Colin Hay author's page
By Colin Hay - May 14, 2025

Sustainable battery materials developer Talga Group (ASX: TLG) has signed a binding offtake agreement with UK-based Nyobolt for a multi-year supply of the company’s unique Talnode-C graphite anode.

Talga will supply Nyobolt, a global leader in ultra-fast battery charging technologies, from its Vittangi anode project in Sweden.

Under the offtake agreement, Nyobolt has committed to purchasing approximately 3,000 tonnes of Talnode-C for an initial term of four years commencing from 13 May 2025.

Validation of Talnode-C​

Talga Group chief executive officer Martin Phillips said the deal validated Talnode-C as a feedstock for its proprietary fast-charging battery technology in the wake of the European Commission designating Talga’s natural graphite mine and anode refinery operations as “strategic projects”.

“This agreement marks a significant milestone in Talga’s mission to deliver sustainable, high-power anode materials to the global battery market,” Mr Phillips said.

“[It] also underpins the start of commercial sales and follows extensive qualification and validation in exciting high-power applications that are subject to high-growth market demand.”

High-grade natural graphite​

Talnode-C is made from Talga’s unique Swedish high-grade natural graphite and proprietary coating processes to offer an industry-leading, low-emission active anode material made using renewable energy.

Talga’s electric vehicle anode demonstration plant in Luleå will provide the initial supply to Nyobolt and the company will supply the balance from the commercial plant it plans to start building in Luleå from 2026, subject to final investment decision.

Talga is currently engaging with a number of other targeted high-value customers to secure purchase commitments for remaining Talnode-C production capacity to support the development of the Vittangi anode project.

Range of applications​

Nyobolt deploys its systems in a growing range of applications including high-performance and heavy-duty vehicles, AI warehouses and data centres.

Chief executive officer Dr Sai Shivareddy said the partnership with Talga is a strategic pillar in his company’s globally diversified sourcing approach.

“Nyobolt is evolving rapidly as more customers seek high performance and maximum uptime for a growing range of power-intensive applications.”
 
  • Like
  • Fire
Reactions: 10 users

Semmel

Top 20

here is an interesting article. Interesting for multiple reasons. Mark linked it on his twitter, which gives this article somewhat of a legitimacy and stamp of approval. Of course, that doesnt mean Mark agrees with everything written in it, but its at least some indication. This is an important point because that article contains some information that is either totally fabricated or based on some knowledge we are not privy to.

1. The article reads that the EVA plant has a capacity of 500 tpa. I stated the same number earlier today but that was total guesswork on my part. However, here, it is stated as fact and published by an ASX Ann in 2024. I dont remember that Ann. That might be because my brain is sort of fried right now with work and family, but ... well, if someone finds the Ann in question that would be good. In any case, I was under the impression that we dont know the true capacity of the EVA plant. Well, even if that 500 tpa is true, it doesnt mean Talnode-C is produced economically with it. Most likely not. But it is an interesting piece of information.

2. It names an offtake price of $15k/t. Assuming USD here (not specified in the article). That is quite a bit higher than expected. Again, they write "assumign".. however, why assume such a high price if you dont have information to the effect that its going to be higher than the DFS price (which was $12k/t)? I dont know, it seems.. dubious. The article is not bad. If it was, I wouldnt trust it in the first place, but .. with Mark citing it and otherwise being quite a good article in my opinion.. it seems there is more to it than "we made stuff up". Maybe but.. hmm, thinking out loud here.

If the numbers in the article are actually true and the first shipment of Talnode-C is under way to Nyobolt.. we might not need a CR after all, which.. if this turns out to be true would light a fire under the share price. Fingers crossed.
 
  • Like
  • Love
Reactions: 6 users

here is an interesting article. Interesting for multiple reasons. Mark linked it on his twitter, which gives this article somewhat of a legitimacy and stamp of approval. Of course, that doesnt mean Mark agrees with everything written in it, but its at least some indication. This is an important point because that article contains some information that is either totally fabricated or based on some knowledge we are not privy to.

1. The article reads that the EVA plant has a capacity of 500 tpa. I stated the same number earlier today but that was total guesswork on my part. However, here, it is stated as fact and published by an ASX Ann in 2024. I dont remember that Ann. That might be because my brain is sort of fried right now with work and family, but ... well, if someone finds the Ann in question that would be good. In any case, I was under the impression that we dont know the true capacity of the EVA plant. Well, even if that 500 tpa is true, it doesnt mean Talnode-C is produced economically with it. Most likely not. But it is an interesting piece of information.

2. It names an offtake price of $15k/t. Assuming USD here (not specified in the article). That is quite a bit higher than expected. Again, they write "assumign".. however, why assume such a high price if you dont have information to the effect that its going to be higher than the DFS price (which was $12k/t)? I dont know, it seems.. dubious. The article is not bad. If it was, I wouldnt trust it in the first place, but .. with Mark citing it and otherwise being quite a good article in my opinion.. it seems there is more to it than "we made stuff up". Maybe but.. hmm, thinking out loud here.

If the numbers in the article are actually true and the first shipment of Talnode-C is under way to Nyobolt.. we might not need a CR after all, which.. if this turns out to be true would light a fire under the share price. Fingers crossed.

Article looks like AI slop

EVA plant capacity has never been confirmed publicly.
There is no asx announcement in 2024 that says 500tpa, AI hallucinated it.

Mark once alluded to it being equivalent to one production line of the 3 that was planned in Vittangi, implying 6000tpa for anyone paying attention. This was obviously not true and I think misleading. This is where the idea that the EVA can be generating money has got inside the heads of holders. He confirmed in the webinar that it can’t produce at a scale that is profitable, so anything done for this offtake will only be used to satisfy the terms while they wait until 2028-29 for Vittangi to come online. Don’t hold out that it’s an early money making exercise. It’s not.
 
  • Like
Reactions: 1 users

Gvan

Member
Article looks like AI slop

EVA plant capacity has never been confirmed publicly.
There is no asx announcement in 2024 that says 500tpa, AI hallucinated it.

Mark once alluded to it being equivalent to one production line of the 3 that was planned in Vittangi, implying 6000tpa for anyone paying attention. This was obviously not true and I think misleading. This is where the idea that the EVA can be generating money has got inside the heads of holders. He confirmed in the webinar that it can’t produce at a scale that is profitable, so anything done for this offtake will only be used to satisfy the terms while they wait until 2028-29 for Vittangi to come online. Don’t hold out that it’s an early money making exercise. It’s not.

"Mark once alluded to it being equivalent to one production line of the 3 that was planned in Vittangi, implying 6000tpa for anyone paying attention. This was obviously not true and I think misleading."

You're incorrect. The actual quote was:

"The EVA plant, the little bits of mechanical kit and ovens, represents about one-third of one of these lines, so we’re just expanding that."

One-third of one of these lines is not the same as one production line out of the three.
 
  • Like
Reactions: 10 users
"Mark once alluded to it being equivalent to one production line of the 3 that was planned in Vittangi, implying 6000tpa for anyone paying attention. This was obviously not true and I think misleading."

You're incorrect. The actual quote was:

"The EVA plant, the little bits of mechanical kit and ovens, represents about one-third of one of these lines, so we’re just expanding that."

One-third of one of these lines is not the same as one production line out of the three.

Thanks for the correction. I’ve seen the “one of three” repeated elsewhere so I can’t be the only one that thought that.

Therefore he was alluding to the EVA capacity being around 2000tpa.
Where does 500t come from?
Back in 2020 in asx releases Talga were talking about it being 100-200tpa. Lots of conflicting information out there.

Whats your insight Gvan?
 
Also for anyone paying attention - Gvan is clearly the most knowledgeable Talga non-insider around. This is my first correction from him.
I’ll take that as a tacit endorsement that everything else I’ve said it broadly correct.
 

DAH

Regular
Also for anyone paying attention - Gvan is clearly the most knowledgeable Talga non-insider around. This is my first correction from him.
I’ll take that as a tacit endorsement that everything else I’ve said it broadly correct.
Rest easy Magpie as we all pay attention to GVAN (and are very grateful to them). I just took you off ignore to see who GVAN was referring to - so surprised to see its you :)

And don't make the assumption you're otherwise correct, as the jury is still out and it's not looking good for your position.

You've been very vocal in your believe that Talga cannot get anywhere near DFS pricing for Tal-C, and therefore no parties are willing to fund the project as it's not economically viable.

We shouldn't need to wait too much longer to see this concluded. I don't like your chances.

Back on ignore... 😴
 
  • Like
  • Love
Reactions: 9 users

Gvan

Member
Thanks for the correction. I’ve seen the “one of three” repeated elsewhere so I can’t be the only one that thought that.

Therefore he was alluding to the EVA capacity being around 2000tpa.
Where does 500t come from?
Back in 2020 in asx releases Talga were talking about it being 100-200tpa. Lots of conflicting information out there.

Whats your insight Gvan?

Yes, there is conflicting information, likely due to situations changing as the multi-year story unfolds.

Mark has spoken in the past about auto customers possibly needing 1 to 10 tons, per sample, over 6-12 months for the larger scale testing. Previous presentations showed Talga had upwards of 48 customers trialing the anode, 11 of which were automotive.

We can probably use that to roughly estimate the EVA plant’s output, depending on how many customers are at the A, B, or C-sample testing stage.

Talga’s first run of trial mining in 2016 led to ~5k tons of graphite ore stockpiled. When talking about the importance of the second trial mine, Mark stated that they currently only have enough left for 500 tons of anode, unsure if that would be enough for the amount of customer trials.

At the same time, Mark answered this question at 38:30 in the recent webinar. The EVA plant is not a commercial scale plant. Does that status change in any way once Talga's 19.5ktpa is fully committed under multi-year, binding contracts? Will customer trials continue at the same intensity, or will plant capacity be freed up to make initially supplying Nyobolt worthwhile? Perhaps some questions for the next webinar.
 
Last edited:
  • Like
  • Love
  • Thinking
Reactions: 5 users

Semmel

Top 20
Talga’s first run of trial mining in 2016 led to ~5k tons of graphite ore stockpiled. When talking about the importance of the second trial mine, Mark stated that they currently only have enough left for 500 tons of anode, unsure if that would be enough for the amount of customer trials.

Thx for helping to piece this together!

The 500t anode stockpile is off the first trail mine, not the stockpile of the second one, correct? Do you remember how much ore we have there? I remember it was significantly more than the first, and especially significantly more than 500t anode left.

To add, I would love to see offtake agreements with significantly more dollars per tonne than in the DFS but I have a hard time imagining that. I don't have a negative view on talga in case you are wondering, but it could be just about profitable with $8k/t. Not a great business but it can survive on that. So that's why I think customers will push talga to that limit. I sincerely hope it's otherwise but my hopes and dreams have been disappointed so many times, I prefer a pessimistic view until proven otherwise.
 
  • Like
Reactions: 1 users

Manual

Member
Thx for helping to piece this together!

The 500t anode stockpile is off the first trail mine, not the stockpile of the second one, correct? Do you remember how much ore we have there? I remember it was significantly more than the first, and especially significantly more than 500t anode left.

To add, I would love to see offtake agreements with significantly more dollars per tonne than in the DFS but I have a hard time imagining that. I don't have a negative view on talga in case you are wondering, but it could be just about profitable with $8k/t. Not a great business but it can survive on that. So that's why I think customers will push talga to that limit. I sincerely hope it's otherwise but my hopes and dreams have been disappointed so many times, I prefer a pessimistic view until proven otherwise.
Semmel,
Isn’t the answer 27,000 tonnes of ore?
IMG_7528.jpeg
 
  • Like
  • Fire
  • Love
Reactions: 10 users

Semmel

Top 20
How much higher dollars per tonne is realistic in your view?
About 17 furlong per fortnight
 
  • Haha
Reactions: 3 users

cosors

👀
About 17 furlong per fortnight
Well then I'm glad it's not the Bergisch or the Prussian inch.
Did you know that there are 273 different inches?
 
  • Like
Reactions: 1 users

cosors

👀
One day
Screenshot_2025-06-11-21-53-31-01_40deb401b9ffe8e1df2f1cc5ba480b12.jpg



___
In Sweden, we have good resources of various minerals, and now we are taking steps to ensure that we can also extract them in order to break the dependence on other countries, especially those that do not share our values.
Screenshot_2025-06-11-22-03-33-09_40deb401b9ffe8e1df2f1cc5ba480b12.jpg

Screenshot_2025-06-11-22-04-50-24_40deb401b9ffe8e1df2f1cc5ba480b12.jpg



____
I've never noticed such a big response in the Swedish media over the years, and in such a short time.
Maybe it's because the information comes directly from the government.
 
Last edited:
  • Like
Reactions: 5 users

Gero

Regular
With thanks to Keith on HC:

Talga Group’s Nunasvaara South: Sweden’s Critical Graphite Resource for Europe​

ByJohn Zadehon June 12, 2025
Talga Group's Nunasvaara South graphite depiction.

What Makes Nunasvaara South a Critical European Graphite Resource?​

As Europe races toward electrification, the Nunasvaara South graphite deposit in northern Sweden stands as a beacon of resource security in an increasingly volatile global market. This project, developed by Australian-listed Talga Group (ASX: TLG), represents not just Sweden's first graphite mine in modern times, but a cornerstone of European energy independence.

Europe's Growing Battery Material Needs​

The European battery sector faces a critical supply challenge as manufacturing capacity expands exponentially. Current projections indicate European gigafactories will require over 500,000 tonnes of graphite anode materials annually by 2030—a sixteen-fold increase from 2023 levels. Without domestic sources, this demand would rely entirely on imports, primarily from China which currently controls approximately 84% of global graphite processing.
"Europe's battery industry cannot survive on imported materials if we truly want energy independence," explains Mark Thompson, Talga's founder and managing director. "The Nunasvaara project transforms Europe from a graphite importer to a producer of advanced battery materials made to the highest environmental standards."
The geopolitical implications are substantial. Every 10,000 tonnes of locally-produced graphite reduces Europe's EU critical minerals supply dependency by approximately 7%, strengthening economic resilience against supply chain disruptions that have plagued manufacturing since 2020.

Geological Significance of the Vittangi Graphite Project​

What makes Nunasvaara South exceptional is its remarkable combination of size, grade, and quality. The deposit contains 28.7 million tonnes of measured resource at an extraordinary grade of 25.8% graphitic carbon—nearly four times higher than the global average for graphite mines.
The deposit's geological formation is particularly advantageous. Unlike many graphite resources that require extensive processing, Nunasvaara's mineralization occurs within a highly metamorphosed graphite schist formation, resulting in:
  • Higher crystallinity graphite structures ideal for battery applications
  • Naturally larger flake sizes that improve conductivity
  • Lower impurity levels requiring less chemical processing
  • Superior electrochemical performance compared to synthetic alternatives
These natural advantages translate directly to manufacturing benefits, with Talga's internal testing demonstrating their graphite delivers approximately 20% greater energy capacity per gram compared to industry standard materials currently imported from Asia.

How Did Regulatory Challenges Shape This Project's Development?​

The path to production for Nunasvaara South involved navigating one of Europe's most stringent regulatory environments, with multiple stakeholders and competing interests shaping the final project design.

Navigating Sweden's Mining Permit Framework​

Sweden's multi-stage mining permitting process is among the world's most comprehensive, requiring developers to secure separate permits for:
  1. Exploration rights (undersökningstillstånd)
  2. Exploitation concession (bearbetningskoncession)
  3. Environmental permit (miljötillstånd)
  4. Building and operational permits
For Talga Group, this journey began in 2012 with initial exploration and culminated in June 2025 with the Swedish government's dismissal of all appeals against the exploitation concession. This final victory came after:
  • 14 distinct stakeholder consultation rounds
  • 23 environmental impact assessment revisions
  • 8 separate court hearings challenging various aspects of the project
  • More than €24 million in pre-development expenditures
"This regulatory gauntlet has ultimately created a better project," notes Martin Phillips, Talga's CEO. "Each challenge forced us to innovate and improve our environmental credentials beyond what we initially considered possible."

Legal Precedents Established Through the Appeals Process​

The most significant legal hurdle involved challenges from environmental groups concerned about impacts on nearby Natura 2000 protected areas and from Sami reindeer herders worried about grazing land disruption.
The Swedish Land and Environment Court's pivotal ruling established several important precedents that will guide future mining developments:
"Critical mineral projects must balance environmental protection with strategic national interests. The court finds that Talga's comprehensive mitigation strategies for water management and biodiversity protection meet and exceed EU directive requirements, while addressing a resource need vital to Sweden's climate transition objectives."
This ruling introduced a formal "proportionality test" for Swedish mining applications, weighing economic and strategic benefits against environmental impacts. For Nunasvaara South, the court determined that:
  1. The graphite's strategic importance to battery manufacturing constituted a "compelling public interest"
  2. Proposed mitigation measures adequately addressed environmental concerns
  3. No alternative sites could provide comparable graphite quality with less environmental impact
To address Sami concerns, Talga established a €10 million compensation fund and redesigned transportation routes to avoid peak migration seasons—innovations that now serve as a template for indigenous engagement across Scandinavia.

What Makes Vertical Integration Essential for Battery Material Production?​

Talga's business model goes beyond traditional mining by integrating the entire value chain from extraction to finished battery materials—a strategy that delivers significant competitive advantages.

The Mine-to-Anode Production Model​

Traditional graphite supply chains involve multiple intermediaries, each adding cost and complexity:
Supply Chain StageTraditional ModelTalga's Integrated Model
MiningSeparate companyTalga Group
ConcentrationSeparate processorTalga Group
PurificationChinese processorTalga Group
Shaping/CoatingBattery material companyTalga Group
Final CustomerBattery manufacturerBattery manufacturer
This vertical integration delivers several critical advantages:
  • Quality control: Unbroken chain of custody ensures consistent specifications
  • Cost reduction: Elimination of intermediary markups reduces production costs by approximately 35%
  • Traceability: Complete documentation of environmental and social standards
  • Innovation potential: Ability to customize materials for specific battery chemistries
  • Reduced carbon footprint: Minimized transportation between production stages
The approach also aligns with EU Battery Regulation requirements for supply chain due diligence and carbon footprint declarations, positioning Talga's products favorably against imported alternatives.

The Luleå Anode Production Facility​

The cornerstone of Talga's vertical integration strategy is its Luleå anode refinery, located approximately 250km from the mine site and designed to transform raw graphite into battery-ready anode materials.
This facility incorporates several technological innovations:
  • Proprietary "green purification" process replacing traditional hydrofluoric acid with organic solvents
  • Sweden's abundant hydroelectric power enabling 95% renewable energy use
  • Closed-loop water systems reducing fresh water consumption by 80%
  • Heat recovery systems capturing process energy for district heating
With a production capacity of 19,500 tonnes of battery anode material annually, the facility can supply enough material for approximately 250,000 electric vehicles per year—roughly 5% of European production needs by 2026.
The facility's strategic location in northern Sweden's "battery belt" positions it within 200km of Northvolt's gigafactory and provides direct rail access to battery manufacturers across Scandinavia and central Europe.

How Does This Project Align With EU Critical Minerals Strategy?​

The European Union has recognized the strategic importance of securing domestic supplies of battery materials, with graphite featuring prominently on its critical raw materials list since 2017.

Strategic Project Designation Significance​

In 2023, the European Commission formally designated Nunasvaara South as a "Strategic Project" under the European Critical Raw Materials Act—one of only seven mining projects to receive this status. This designation acknowledges the project's importance to Europe's industrial competitiveness and energy transition goals.
The Strategic Project status provides several concrete benefits:
  • Streamlined permitting procedures with binding time limits
  • Priority access to financing through the European Investment Bank
  • Inclusion in coordinated European supply chain planning
  • Technical support from the European Raw Materials Alliance
  • Preferential consideration for public procurement contracts
More significantly, the designation represents formal recognition that domestic graphite production serves essential European strategic interests—a powerful counterargument against opposition to mining development.

European Innovation Fund Support Mechanisms​

The project's alignment with EU priorities is further evidenced by its receipt of a substantial €124 million grant from the European Innovation Fund in 2024. This represents one of the largest single grants awarded to a critical minerals project and covers approximately 40% of the development's capital expenditure.
This funding comes with specific performance requirements:
  1. Achieving a carbon footprint at least 60% below industry benchmarks
  2. Meeting production milestones on an accelerated timeline
  3. Participating in knowledge-sharing networks with other European battery material producers
  4. Developing training programs to build European expertise in graphite processing
The grant structure includes performance-based disbursements tied to emissions reductions, ensuring the project delivers on its sustainability promises while accelerating Europe's transition to domestic battery material production.

What Environmental and Social Governance Frameworks Are Being Implemented?​

Talga Group has positioned Nunasvaara South as a model of responsible resource development, with environmental and social considerations embedded throughout project design.

Environmental Impact Management Strategies​

The project incorporates numerous innovations to minimize its environmental footprint:
  • Water management: Closed-loop systems recycle 95% of process water, with remaining discharge treated through constructed wetlands before release
  • Biodiversity protection: Wildlife corridors maintain habitat connectivity, with seasonal mining schedules adjusted around sensitive breeding periods
  • Carbon reduction: Fleet electrification and renewable energy sourcing target carbon-neutral operations by 2027
  • Waste minimization: Tailings repurposed as construction materials and mine backfill, eliminating conventional tailings ponds
  • Land rehabilitation: Progressive restoration of mined areas using native species and seed banks collected before development
These measures align with Sweden's world-leading environmental standards and the EU Taxonomy for sustainable activities, positioning the graphite produced as among the most environmentally responsible globally.
"Graphite from Talga will be a key material in battery manufacturing and the green transition to a fossil-fuel free society," stated Swedish Energy, Business and Industry Minister Ebba Busch, emphasizing the project's environmental credentials.

Community Engagement and Indigenous Relations​

Recognizing the importance of social license to operate, Talga has developed comprehensive stakeholder engagement frameworks:
  1. Sami Impact Benefit Agreement: Formal agreement with affected reindeer herding districts providing compensation, employment opportunities, and collaborative decision-making
  2. Local Employment Targets: Commitment to 20% local hiring and skills development programs
  3. Community Development Fund: Annual contributions to regional infrastructure and educational initiatives
  4. Transparency Mechanisms: Regular public reporting on environmental performance and community impacts
A joint monitoring committee comprising Sami representatives, local government officials, and Talga staff provides ongoing oversight of environmental compliance and community benefit delivery, ensuring accountability throughout the mine's operational life.

How Will This Project Impact the Global Graphite Market?​

Nunasvaara South's development occurs against a backdrop of rapidly evolving global graphite supply dynamics, with significant implications for both European and international markets.

Market Position in the European Battery Supply Chain​

The project's initial 19,500-tonne annual production capacity represents a modest but strategic position in the global graphite market:
Market SegmentNunasvaara South Market Share
European Graphite Demand (2026)~15%
Global Natural Graphite Production~2%
Global Battery Anode Material~1.5%
While these percentages appear small, they represent critical supply security for European manufacturers. Current battery production plans require 100% importation of graphite materials, with associated risks of:
  • Price volatility during supply shortages
  • Quality inconsistencies from distant suppliers
  • Geopolitical leverage by producing nations
  • Carbon footprint implications of global shipping
By establishing domestic production, Talga provides European manufacturers with a strategic alternative that reduces these vulnerabilities while potentially influencing pricing dynamics across the market.

Reshaping Global Graphite Supply Dynamics​

The emergence of European graphite production could trigger several shifts in global markets:
  1. Price differentiation: Premium pricing for environmentally certified European materials compared to conventional sources
  2. Quality benchmarking: Establishment of more rigorous performance standards favoring higher-grade deposits
  3. Investment signals: Accelerated development of graphite resources in politically stable jurisdictions
  4. Processing innovation: Pressure on traditional producers to adopt cleaner technologies
Industry analysts project that by 2030, European domestic graphite production could account for 25-30% of regional demand, significantly reshaping trade flows and reducing China's current dominance in battery material processing.

What Technical Innovations Differentiate This Project?​

Beyond its strategic importance, Nunasvaara South incorporates several technical innovations that advance the state of graphite mining and processing.

Advanced Extraction and Processing Methods​

Traditional graphite mining often involves extensive drilling, blasting, and crushing—processes that can damage the crystalline structure of graphite flakes and reduce their value for high-performance applications.
Talga has developed modified extraction methods specifically designed for the unique geology of Nunasvaara South:
  • Selective mining techniques preserving natural flake structures
  • Optimized crushing parameters minimizing flake degradation
  • Advanced flotation circuits achieving 95%+ recovery rates
  • Proprietary purification processes avoiding harsh chemical treatments
These innovations result in graphite with superior performance characteristics for battery applications, including:
  • Higher reversible capacity (372 mAh/g vs. industry standard 350 mAh/g)
  • Improved first-cycle efficiency (93% vs. typical 90%)
  • Better high-rate performance for fast-charging applications
  • Enhanced stability during extended cycling

Sustainable Production Technologies​

The project implements several sustainable mining practices rarely seen in graphite processing:
  1. Reagent recovery systems capturing and recycling 85% of chemicals used in purification
  2. Dry processing techniques reducing water consumption by 40% compared to conventional methods
  3. AI-optimized energy management adjusting processing parameters to minimize consumption
  4. Heat exchange networks capturing waste heat for use in subsequent processing steps
Collectively, these technologies result in a carbon footprint approximately 70% lower than Chinese-produced battery-grade graphite and 90% lower than synthetic graphite alternatives—a critical advantage as automotive manufacturers increasingly scrutinize supply chain emissions.

FAQ: Nunasvaara South Graphite Project​

What timeline is projected for full production capacity?​

Construction is scheduled to begin in Q3 2025 following the final permit approvals, with commissioning targeted for late 2026. The production ramp-up will follow this sequence:
  1. Q1 2027: Initial mining operations and concentrate production (5,000 tonnes)
  2. Q3 2027: Luleå anode facility commissioning
  3. Q2 2028: Commercial anode material production begins
  4. Q4 2028: Full production capacity achieved (19,500 tonnes annually)
This timeline could accelerate by 3-6 months if electric grid connections for the Luleå facility are prioritized under the Strategic Project designation, or it could face delays if equipment delivery challenges similar to those affecting other European industrial projects emerge.

How does Swedish graphite compare to synthetic graphite alternatives?​

Natural graphite from Nunasvaara South offers several performance advantages over synthetic alternatives:
ParameterNunasvaara Natural GraphiteSynthetic Graphite
Energy Density372 mAh/g340-360 mAh/g
First Cycle Efficiency93%90%
Production Energy5-8 kWh/kg25-30 kWh/kg
Carbon Footprint3.5 kg CO₂e/kg15-20 kg CO₂e/kg
Production Cost$3,500-4,000/tonne$8,000-12,000/tonne
These advantages make natural graphite particularly attractive for mass-market EV applications where cost efficiency remains critical. However, some ultra-premium applications still utilize synthetic graphite blends for specific performance characteristics.

What potential exists for resource expansion beyond current estimates?​

The Vittangi graphite project, which includes Nunasvaara South, contains several additional exploration targets with significant expansion potential:
  • Nunasvaara North: Drilling has confirmed continuation of high-grade mineralization with an inferred resource of 5.6 million tonnes
  • Niska Deposits: Located 3km from Nunasvaara, containing an additional 7.3 million tonnes of indicated resources
  • Jalkunen Prospect: Early-stage exploration area with similar geological characteristics to Nunasvaara
Combined, these resources could potentially extend production for 40+ years or support expansion to approximately 100,000 tonnes of annual anode production—sufficient to supply approximately 1.2 million electric vehicles annually.

How will this project influence Sweden's position in the battery supply chain?​

Nunasvaara South represents a critical component in Sweden's emerging position as Europe's "battery belt." The country already hosts:
  • Northvolt's 60 GWh gigafactory in Skellefteå
  • LKAB's REE processing facility in Luleå
  • H2 Green Steel's hydrogen-based steel plant in Boden
The addition of domestic graphite production creates vertical integration opportunities for Sweden's battery industry, potentially attracting additional
 
  • Like
  • Fire
  • Love
Reactions: 12 users

Semmel

Top 20
Quite a nice and comprehensive summary of the project. Thanks to Keith, Gero for sharing and John Zadehon for writing it! 👍
 
  • Like
  • Love
Reactions: 4 users


Talga mine: The government is running over Kiruna for the second time
Published 12 hours ago
3 min reading time
Mats Taaveniku ( S ), municipal council in Kiruna and Energy and Minister of Industry Ebba Busch ( Kd ).
Municipal Council Mats Taaveniku is critical of the government running over the municipality in terms of developing a detailed plan for Talga's planned mine in Vittangi. Photo: Christine Olsson / TT / Claudio Bresciani

Kiruna Municipality refused to adopt a detailed plan for the disputed graphite mine in Vittangi. Then the government presented the municipality with an ultimatum, which caused the municipal council to change. But it was too slow, the government considered, which now allows the County Administrative Board to draw up the plan.
– Sad and unhappy, says the municipal council Mats Taaveniku ( S ) to P4 Norrland.

Ossian Sandin
Ossian Sandin
Environmental and climate editor

Share
Outside Vittangi, near Lake Hosiojärvi in the Torne River basin, the Australian company Talga Group is planning a mine for graphite. A mineral used in the manufacture of electric car batteries. But the planned mine is disputed. Opponents of the mine, in addition to the direct environmental impact, also fear that nearby rivers can be damaged. Talma Sami also opposes the plans, whose year-round lands are within the area of the planned mine. At the same time, Kiruna Municipality has also protested. Municipal Council Mats Taaveniku ( S ) has pointed out that there is no gain for the municipality and its inhabitants – and refused to develop a detailed plan for the area.

– It is a political mark. We will be quite skeptical about new mines in Kiruna municipality until we get the state to give back some money based on the natural resources and the values that natural resources create, Mats Taaveniku told Svt.


In Vittangi, several manifestations have been held against Talga's planned graphite mine. Photo: Hanna Råman
Run over municipal self-government
The protest led to the government choosing to run over the municipality, which until June 16 had to draw up a detailed plan. Otherwise, the County Administrative Board would receive the assignment. The municipality changed its attitude to have the opportunity to gain influence on the process. But on Friday, the issue took another turn. The government announced that Kiruna was deprived of the opportunity to develop the detailed plan for the mine with reference to the fact that the municipality does not comply with the planning, NSD reports. Instead, it will fall on the County Administrative Board to prepare the plan.

– What I am even more concerned about is undermining municipal self-government with such a decision, comments the municipal council Mats Taaveniku message to P4-Norrland.

Energy – and Minister of Industry Ebba Busch say in a statement that ” Sweden has the most sustainable mining industry in the world, it is ethically sustainable, environmentally sustainable and has good working conditions ”.

– Despite high demand for almost all metals, very few new mines are started in Sweden. With this decision, I hope that Sweden will get its 14th mine, she says.

Talga's planned mine was one of the Swedish projects that was named ” strategic ” by the EU recently.
 
  • Like