ZIJIN AND MMGA

Zijin Articles




 
Last edited:
  • Fire
  • Like
Reactions: 4 users
Media Reports About Zijin Mining

👇

Chinese ZIJIN MINING mocks Félix Tshisekedi's mining policy

And….

COMMUS, a subsidiary of Zijin Mining, accused of serious human rights violations in Kolwezi


econewsrdc.com
Le Chinois ZIJIN MINING se moque de la politique minière de Félix Tshisekedi : COMMUS, une...


Lithium Manono: How is ZIJIN with the illegal 15% (IGF) part of DATHCOM without any court decision?

kongopress.com
Lithium Manono : Comment ZIJIN avec les 15% illégaux (IGF) fait-elle partie de DATHCOM sans aucune...



In less than a year, the company Zijin was convicted four times for the same commercial offence, each time fined below the legal minimum

https://reri.org.rs/en/in-less-than-a-year-the-company-zijin-was-convicted-four-times-for-the-same-commercial-offence-each-time-fined-below-the-legal-minimum/#:~:text=News%20%2F%20Zijin%20Copper-,In%20less%20than%20a%20year%2C%20the%20company%20Zijin%20was%20convicted,the%20legal%20minimum%20each%20time.

reri.org.rs
In less than a year, the company Zijin was convicted four times for the same commercial offence,...


China’s Zijin mine polluting Serbian village

asiafinancial.com
China’s Zijin Mining Polluting Serbian Village, Says Group


In Kolwezi in the Lualaba province where more than 39,000 people live. Hundreds of residents have received orders to leave their homes without being consulted after the plans to expand the ZIJIN mine. Many houses have already been destroyed

kongopress.com
Rapport d'Amnesty International sur les minerais des batteries et les droits humains bafoués en RDC...


Zijin’s Negligence: How the Demolition of the Smelter Cost a Worker His Life

https://cins.rs/en/zijin-s-negligence-how-the-demolition-of-the-smelter-cost-a-worker-his-life/
 
Last edited:
  • Fire
  • Like
Reactions: 8 users
The Following Link Has Information On MMGA Who Are Backed By The Chinese Companies Wanting To Takeover Manono

 
Last edited:
  • Like
  • Fire
Reactions: 4 users

Dave Evans

Regular
 
  • Like
Reactions: 1 users

Dave Evans

Regular
Another false and deceptive article full of disinformation from Zoomeco and The Tribune

15/11/2023
Underwaterdark Posted

IN THE NEWS

DRC: Revelation on the reason for the cancellation of AVZ's mining permit (Tribune)​

Avatar of La Rédaction

Published
3 hours ago
November 15, 2023
By Anonymous

AVZ


Recently, AVZ filed an ICSID arbitration request against the DRC government regarding the cancellation of the mining permit (PE) order by the Ministry of Mines, and this arbitration brought AVZ back into the spotlight. the ramp.
According to the January 2023 order of the Ministry of Mines, the 2022 order granting a mining permit to Dathcom has been canceled.

rev1


According to the investigation, AVZ's MOU application also violated the provisions of the Mining Code and Dathcom's JV contract regarding the application for a mining permit:

1. The feasibility study submitted by Dathcom is illegal and, in accordance with articles 6.2 and 6.4 of the 2017 Dathcom JV contract, must be approved by Cominière, but it is clear that AVZ did not transmit the study to Cominière before its submission to the Ministry of Mines in April 2022, not to mention obtaining approval from Cominière, nor the approval of the Board of Directors and the General Meeting of Shareholders of Dathcom.

rev2


2. The proof of financing submitted by Dathcom is fraudulent, in accordance with article 71 of the Mining Law” (b): demonstrate the existence of the financial resources necessary to carry out its project according to a financing plan for development work , construction and operation of the mine as well as the site rehabilitation plan upon its closure. This plan specifies each type of financing, the targeted sources of financing and the justifications for their probable availability. In all cases, the share capital contributed by the applicant cannot be less than 40% of said resources”. In the feasibility study announced by AVZ, the investment is 550 million US dollars, so Dathcom never had 220 million US dollars in its accounts.

rev5


3. The MOU application presented by AVZ is illegal and Dathcom's decision to give up the 82 squares located in the northeast was not approved by the General Meeting of Shareholders of Dathcom, which is suspected of being an insider trading with AJN (Nigel is a shareholder and director of AJN) and which harmed the interests of other shareholders.

rev3

rev4

Dathcom/AVZ provided an illegal and incomplete feasibility study because the ownership of the Mpiana Mwanga hydroelectric plant belongs to Cominière, not to Dathcom, and even less to AVZ Power, and above all, the inclusion of the hydroelectric plant in the feasibility study by Dathcom/AVZ is an illegal attack on state property, while AVZ did not respond, for financial reasons, to the call for tenders launched by Cominière for the rehabilitation of the Mpiana Mwanga hydroelectric power station.

In view of the above, Dathcom's MOU was withdrawn for reasonable and legitimate reasons, and the ICSID arbitration initiated by AVZ has no future in the face of these facts.

 
  • Like
  • Wow
Reactions: 2 users

Xerof

Biding my Time 1971
Written by Kabeya...........
 
  • Like
Reactions: 1 users

Dave Evans

Regular
17/11/2023
Samus Posted

Another false and deceptive article full of disinformation from Zoomeco and The Tribune

DRC: AVZ suffers a heavy defeat in ICC emergency arbitration (Tribune)​


Published
November 16, 2023

Tribune-On November 16, 2023, according to the latest information, within the framework of ICC emergency arbitration No. 27720/SP (AVZ v. Cominiere), of which AVZ is so proud, the emergency arbitrator rendered his decision :​

(1) to refuse to order the payment of a penalty of 22 million euros;
(2) to significantly reduce the period of validity of its first injunction, and the injunction will expire immediately after the constitution of the final arbitral tribunal;

(3) to reject all other requests from AVZ, including that of tripling the amount of the penalty from €50,000/day to €150,000/day.

It is clear that the court made the right decision in removing the " advantage " claimed by AVZ after being informed of the numerous facts that AVZ had violated DRC law, breached the JV contract and hindered the development of the Manono mine for seven years.

The ICC court made significant changes from the May 2023 injunction.

It is understood that Cominière remains determined to pursue its challenge at the appropriate time and to have an arbitral tribunal formed to defend the interests of the State and its population in the arbitration, and the commercial production as soon as possible of the mine. Manono.
E.M.


 
  • Haha
Reactions: 1 users

Dave Evans

Regular
17/11/2023
Samus Posted


The morons at Cominière seem to be trying to paint their loss as a victory, as corrected by Franck here:



That's it. Post the prescription here to prove what you say. It has 62 pages. Otherwise, it confirms the first order securing the Dathcom License until the end of the procedure. A legal victory for AVZ and not the opposite.

In summary: 1) the arbitrator refused the request to pay a fine of 22 million euros. 2) considerably reduced the scope of its first injunction: Before: this until the delivery of the final award on the merits
 
  • Like
Reactions: 1 users

Dave Evans

Regular
18/11/2023

 
  • Like
Reactions: 2 users

Dave Evans

Regular
  • Like
Reactions: 1 users

Dave Evans

Regular
20/11/2023
Thaz Posted

Counter arguements

1700453521056.png

  1. Hardly see any experience in MMGA that resulted in the price of the respective Company's they were a director of increasing for shareholders.
  2. "Known resource of the DFS" - so this would exclude the North tenement?
  3. What is the resolution? to sell us to Z?
  4. "All Parties" - being corrupt and paid for by Z?
  5. "Prior shareholders' approval" - being the Corrupt Chinese trying to steal and halting work on our resource? Recent social media votings shown a 5% 'approval' rating of MMGA.
  6. "cure" - by saying that we no longer have the resource?
  7. Develop Manono and sell it for peanuts to Z?
  8. Relationships are broken with the Corrupt parties.
  9. Litigation is imperative in maintaining our legal ownership of Manono. The court of the public opinion of AVZ is in favour of what we have done for the community.
  10. "Out of money" - lies - recent funding acquired for litigation, with a decent kitty in the bank. Along with the daily fines from Cominere - We're OK for the short-medium term.
  11. International Arbitration is required by the terms of the JV.
  12. Criminal Conviction was false.
  13. The relinquishing of the North was due to corrupt DRC parties working on behalf of/for the Chinese.
  14. The largest shareholder, but not the Majority of shareholders.
  15. The proposed nominations from MMGA will, with no doubt, erode shareholder value to cents on the dollar (if that). The current board is fighting for our legal ownership and title for Manono - the distraction from MMGA is distracting them from working towards this effectively and efficiently.
 
  • Like
Reactions: 1 users

Dave Evans

Regular
I put a copy of MMGA’s false claims they put out on a pdf file ahead of the AGM here
 

Attachments

  • 2023+10+31_MMGA_Strategy+Doc_2.pdf
    3.1 MB · Views: 88
  • Fire
  • Like
Reactions: 2 users

Dave Evans

Regular

Dave Evans

Regular
Top Bottom