Did we get a share of the grid battery bonanza?

https://utilitymagazine.com.au/arena-to-fund-eight-grid-scale-battery-projects-worth-2-7b/


The Australian Renewable Energy Agency (ARENA) has announced the backing of eight grid scale battery projects worth a total value of $2.7 billion. ARENA will provide $176 million in conditional funding to the projects across Australia.
Funded under ARENA’s Large Scale Battery Storage Funding Round, each battery will be equipped with grid-forming inverter technology, allowing them to provide essential system stability services traditionally provided by synchronous generation such as coal and gas.

With a total project value of $2.7 billion and a capacity of 2.0 GW / 4.2 GWh these projects represent a tenfold increase in grid-forming electricity storage capacity currently operational in the National Electricity Market.
The developers and projects ARENA has selected for support are:

  • AGL: a new 250 MW / 500 MWh battery in Liddell, New South Wales
  • FRV: a new 250 MW / 550 MWh battery in Gnarwarre, Victoria
  • Neoen: retrofitting the 300 MW / 450 MWh Victorian Big Battery in Moorabool, Victoria to enable grid-forming capability
  • Neoen: a new 200 MW / 400 MWh battery in Hopeland, Queensland
  • Neoen: a new 200 MW / 400 MWh battery in Blyth, South Australia
  • Origin: a new 300 MW / 900 MWh battery in Mortlake, Victoria
  • Risen: a new 200 MW / 400 MWh battery in Bungama, South Australia
  • TagEnergy: a new 300 MW / 600 MWh battery in Mount Fox, Queensland
The Large Scale Battery Storage Round was launched in December 2021 with an initial funding envelope of $100 million. In recognition of the high quality of applications received, this was expanded to $176 million, including $60 million in additional funding provided to ARENA by the Federal Government in the October 2022 budget as part of its Support for Energy Security and Reliability budget measure.
The eight successful projects were chosen from a shortlist of 12 projects announced in July 2022. ARENA received 54 expressions of interest for the competitive funding round.
ARENA CEO, Darren Miller, said the batteries represent a transformative portfolio of new storage capacity.
“Battery storage is an essential technology in the transition to renewable energy, allowing us to smooth out variable generation and store electricity for when it’s needed,” Mr Miller said.
“These next generation grid scale batteries will underpin this transition, with inverter technology that can maintain grid stability without the need for coal and gas generators. This pipeline of grid-forming projects will help move us closer to an electricity grid that can support 100 per cent renewable energy in the NEM.
“With the high quality of proposals we received, ARENA and the Government saw an opportunity to deliver a step change in grid-forming capability across the NEM, which we’ve backed with additional funding.”
ARENA has previously provided $81 million in funding for eight grid scale batteries, including five with grid forming capability at a smaller scale. The 150 MW / 194 MWh Hornsdale Power Reserve in South Australia, which received ARENA funding for its 2019 expansion, is currently the largest grid forming battery in Australia.
The previous projects have highlighted the potential of grid-forming batteries and the need to support further projects at a larger scale to build experience with the technology, de-risk investment and drive further innovation from inverter manufacturers. The funding round will also help to overcome current commercial and regulatory barriers to large scale deployment.
All the batteries are expected to reach financial close in 2023 and be operational by 2025
.

.
 

Diogenese

Top 20
Did we get a share of the grid battery bonanza?

https://utilitymagazine.com.au/arena-to-fund-eight-grid-scale-battery-projects-worth-2-7b/


The Australian Renewable Energy Agency (ARENA) has announced the backing of eight grid scale battery projects worth a total value of $2.7 billion. ARENA will provide $176 million in conditional funding to the projects across Australia.
Funded under ARENA’s Large Scale Battery Storage Funding Round, each battery will be equipped with grid-forming inverter technology, allowing them to provide essential system stability services traditionally provided by synchronous generation such as coal and gas.

With a total project value of $2.7 billion and a capacity of 2.0 GW / 4.2 GWh these projects represent a tenfold increase in grid-forming electricity storage capacity currently operational in the National Electricity Market.
The developers and projects ARENA has selected for support are:

  • AGL: a new 250 MW / 500 MWh battery in Liddell, New South Wales
  • FRV: a new 250 MW / 550 MWh battery in Gnarwarre, Victoria
  • Neoen: retrofitting the 300 MW / 450 MWh Victorian Big Battery in Moorabool, Victoria to enable grid-forming capability
  • Neoen: a new 200 MW / 400 MWh battery in Hopeland, Queensland
  • Neoen: a new 200 MW / 400 MWh battery in Blyth, South Australia
  • Origin: a new 300 MW / 900 MWh battery in Mortlake, Victoria
  • Risen: a new 200 MW / 400 MWh battery in Bungama, South Australia
  • TagEnergy: a new 300 MW / 600 MWh battery in Mount Fox, Queensland
The Large Scale Battery Storage Round was launched in December 2021 with an initial funding envelope of $100 million. In recognition of the high quality of applications received, this was expanded to $176 million, including $60 million in additional funding provided to ARENA by the Federal Government in the October 2022 budget as part of its Support for Energy Security and Reliability budget measure.
The eight successful projects were chosen from a shortlist of 12 projects announced in July 2022. ARENA received 54 expressions of interest for the competitive funding round.
ARENA CEO, Darren Miller, said the batteries represent a transformative portfolio of new storage capacity.
“Battery storage is an essential technology in the transition to renewable energy, allowing us to smooth out variable generation and store electricity for when it’s needed,” Mr Miller said.
“These next generation grid scale batteries will underpin this transition, with inverter technology that can maintain grid stability without the need for coal and gas generators. This pipeline of grid-forming projects will help move us closer to an electricity grid that can support 100 per cent renewable energy in the NEM.
“With the high quality of proposals we received, ARENA and the Government saw an opportunity to deliver a step change in grid-forming capability across the NEM, which we’ve backed with additional funding.”
ARENA has previously provided $81 million in funding for eight grid scale batteries, including five with grid forming capability at a smaller scale. The 150 MW / 194 MWh Hornsdale Power Reserve in South Australia, which received ARENA funding for its 2019 expansion, is currently the largest grid forming battery in Australia.
The previous projects have highlighted the potential of grid-forming batteries and the need to support further projects at a larger scale to build experience with the technology, de-risk investment and drive further innovation from inverter manufacturers. The funding round will also help to overcome current commercial and regulatory barriers to large scale deployment.
All the batteries are expected to reach financial close in 2023 and be operational by 2025
.

.

From the 2022 Year End Newsletter:


Sydney Energy Forum​

Managing Director, Vincent Algar was invited to attend the Sydney Energy Forum, co-hosted by the Australian Government and the International Energy Agency, with the support of the Business Council of Australia.
The forum fostered connections among investors, business and government, with the focus on innovations in clean-energy technologies.
The global energy crisis has further emphasised the need for collaboration on energy security at the centre of the renewable energy transformation.
bc72e84d-48e7-dd04-619d-94026f9a66c1.jpg

4510c29f-7457-c922-6675-10dc324d6178.jpg

Australian Clean Energy Summit​

The Australian Clean Energy Summit is the peak gathering of leaders driving Australia’s energy transformation.
The two-day conference brought together heads of industry, government and finance to share the models, trends and technology innovations in driving clean energy adoption.
VSUN Energy's Manager Samantha McGahan attended the summit in Sydney on behalf of the company.



Net Zero Emission Mining WA Conference 2022​

Managing Director, Vincent Algar presented at the Net Zero Emission Mining WA Conference 2022 hosted by the Minerals Research Institute of Western Australia (MRIWA).
AVL's subsidiary company VSUN Energy sponsored the two day event & was attended by Zamien Sumich, VSUN Energy's Operations Manager.


... so we had the right people in the right place at the right time.
 
Last edited:
Top Bottom